BUREAU OF CONSTRUCTION & MATERIALS

Questions or Comments may be sent to:

Lee Alvarado LAlvarado@ksdot.org
(785) 296-3576.

Proposal Information

The Proposal Form consists of the following documents: the Project Electronic Bidding System (EBS) file on either KDOT’s or Bid Express’ website (which includes DOT Form 202, required contract provisions and the unit prices list), special provision list, project special provisions, special provisions, standard specifications, plans, exploratory work documents, any additional contract information, and any addendums or amendments the Secretary provides for the Project. Contractors interested in bidding as a prime Contractor and potential subcontractors and suppliers shall acquire these documents using the links provided in the Project information below for the Particular project of interest. Subcontractors, suppliers, and other interested entities may use the Non-Bidding EBS file link below to view a pdf copy of the Project EBS file rather than downloading the EBS file that Contractors use to prepare their proposal.

The Proposal Form becomes the Contractor’s Proposal after the Contractor completes the Project EBS file, signs the Proposal on DOT Form 202, and delivers the completed Project EBS file documents and bid bond to KDOT by mail, in person, or using Bid Express. The special provision list, project special provisions, special provisions, standard specifications, plans, exploratory work documents, any additional contract information, and any addendum are incorporated by reference into the Contractor’s Proposal. These documents are part of the Contractor’s Proposal, but the Contractor does not have to print and deliver them to KDOT with the EBS file and bid bond.

Contractors wanting to bid as a prime contractor shall identify themselves below as a Bid Holder no later than the close of business on the Monday preceding the scheduled Letting Date. Contractors shall furnish this notice by marking the "Bid Holders List" box contained in the Proposal Information for each Project on which the contractors intend to bid, complete the "Request Form" at the bottom and submit. This notice is necessary to obtain KDOT's approval to bid as a prime. In a few days please check the Bid Holder list to confirm KDOT's approval. Subcontractors, suppliers, and other interested entities may identify themselves below as a Non-bid Holder.


12/17/2014 Letting

Scroll down to view Proposal Forms

To view and save documents indicated with PDF Document, you must download the latest free Adobe®Acrobat® Reader®, Click Here

Contract: 514122171  Call#: 217
Project/Federal Project Number: I070-105 KA 1003-08 /NHPP-0706(116)
County: WYANDOTTE
Project Description: GRADE & SURFACING

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports
Plan SheetsPDF Document   |   Plan Sheets #2PDF Document   |   Plan Sheets #3PDF Document  



Working Days: CCD                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514122171]                           [ Non-Bid Holders List for 514122171]


Navigation  
Top | Bottom

Contract: 514122181  Call#: 218
Project/Federal Project Number: K010-023 TE 0372-01 /TEA-T037(201)
County: DOUGLAS
Project Description: SPECIAL

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports
Plan SheetsPDF Document  



Working Days: 60                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514122181]                           [ Non-Bid Holders List for 514122181]


Navigation  
Top | Bottom

Contract: 514122464  Call#: 246
Project/Federal Project Number: 001 TE 0389-01 /TEA-T038(901)
County: ALLEN
Project Description: PEDESTRIAN & BICYCLE PATHS

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports
Plan SheetsPDF Document  



Working Days: 55                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514122464]                           [ Non-Bid Holders List for 514122464]


Navigation  
Top | Bottom

Contract: 514122474  Call#: 247
Project/Federal Project Number: U075-016 KA 3262-01 /NHPP-A326(201)
County: COFFEY
Project Description: MILL & HMA OVERLAY

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 140                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514122474]                           [ Non-Bid Holders List for 514122474]


Navigation  
Top | Bottom

Contract: 514122565  Call#: 256
Project/Federal Project Number: 008 N 0580-01 /STP-N058(001)
County: BUTLER
Project Description: GRADE & SURFACING

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports
Plan SheetsPDF Document  



Working Days: 180                        KDOT Construction Office: WICHITA NORTH
Starting Dates - Earliest: ***        Latest: MARCH 2, 2015
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514122565]                           [ Non-Bid Holders List for 514122565]


Navigation  
Top | Bottom

Contract: 514124131  Call#: 413
Project/Federal Project Number: 003 C 4511-01 /BRO-C451(101)
County: ATCHISON
Project Description: GRADE & BRIDGE

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports
Plan SheetsPDF Document  



Working Days: 110                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514124131]                           [ Non-Bid Holders List for 514124131]


Navigation  
Top | Bottom

Contract: 514124151  Call#: 415
Project/Federal Project Number: 089 C 4614-01 /STP-C461(401)
County: SHAWNEE
Project Description: GRADING & BRIDGE

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports
Plan SheetsPDF Document  



Working Days: 90                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514124151]                           [ Non-Bid Holders List for 514124151]


Navigation  
Top | Bottom

Contract: 514126021  Call#: 602
Project/Federal Project Number: U059-003 KA 3734-01
County: ATCHISON
Project Description: SURFACE RECYCLE & CHIP SEAL

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 30                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126021]                           [ Non-Bid Holders List for 514126021]


Navigation  
Top | Bottom

Contract: 514126041  Call#: 604
Project/Federal Project Number: K009-106 KA 4060-01
County: STATEWIDE
Project Description: MILL & HMA OVERLAY

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 30                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126041]                           [ Non-Bid Holders List for 514126041]


Navigation  
Top | Bottom

Contract: 514126051  Call#: 605
Project/Federal Project Number: U036-007 KA 3370-01
County: BROWN
Project Description: CULVERT REPAIR

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 40                        KDOT Construction Office: HORTON
Starting Dates - Earliest: ***        Latest: NOVEMBER 17, 2014
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126051]                           [ Non-Bid Holders List for 514126051]


Navigation  
Top | Bottom

Contract: 514126061  Call#: 606
Project/Federal Project Number: K214-043 KA 3757-01
County: JACKSON
Project Description: MILL & HMA OVERLAY

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 10                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126061]                           [ Non-Bid Holders List for 514126061]


Navigation  
Top | Bottom

Contract: 514126071  Call#: 607
Project/Federal Project Number: 044 KA 4091-01
County: JEFFERSON
Project Description: MILL & HMA OVERLAY

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 10                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126071]                           [ Non-Bid Holders List for 514126071]


Navigation  
Top | Bottom

Contract: 514126081  Call#: 608
Project/Federal Project Number: U069-046 KA 3739-01
County: JOHNSON
Project Description: MILL & HMA OVERLAY

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 20                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126081]                           [ Non-Bid Holders List for 514126081]


Navigation  
Top | Bottom

Contract: 514126091  Call#: 609
Project/Federal Project Number: U073-052 KA 3745-01
County: LEAVENWORTH
Project Description: ULTRATHIN BONDED ASPHALT SURFACING

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 25                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126091]                           [ Non-Bid Holders List for 514126091]


Navigation  
Top | Bottom

Contract: 514126121  Call#: 612
Project/Federal Project Number: K092-052 KA 3751-01
County: LEAVENWORTH
Project Description: CHIP SEAL

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 10                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126121]                           [ Non-Bid Holders List for 514126121]


Navigation  
Top | Bottom

Contract: 514126131  Call#: 613
Project/Federal Project Number: K016-075 KA 3714-01
County: POTTAWATOMIE
Project Description: MILL & HMA OVERLAY

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 30                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126131]                           [ Non-Bid Holders List for 514126131]


Navigation  
Top | Bottom

Contract: 514126141  Call#: 614
Project/Federal Project Number: U024-075 KA 3721-01
County: POTTAWATOMIE
Project Description: CHIP SEAL

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 15                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126141]                           [ Non-Bid Holders List for 514126141]


Navigation  
Top | Bottom

Contract: 514126151  Call#: 615
Project/Federal Project Number: K013-106 KA 4100-01
County: STATEWIDE
Project Description: MILL & HMA OVERLAY

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 35                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126151]                           [ Non-Bid Holders List for 514126151]


Navigation  
Top | Bottom

Contract: 514126171  Call#: 617
Project/Federal Project Number: K018-106 KA 4097-01
County: STATEWIDE
Project Description: MILL & HMA OVERLAY

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 15                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126171]                           [ Non-Bid Holders List for 514126171]


Navigation  
Top | Bottom

Contract: 514126181  Call#: 618
Project/Federal Project Number: U069-105 KA 3738-01
County: WYANDOTTE
Project Description: ULTRATHIN BONDED ASPHALT SURFACING

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 20                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126181]                           [ Non-Bid Holders List for 514126181]


Navigation  
Top | Bottom

Contract: 514126232  Call#: 623
Project/Federal Project Number: U050-009 KA 3772-01
County: CHASE
Project Description: ULTRATHIN BONDED ASPHALT SURFACING

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 20                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126232]                           [ Non-Bid Holders List for 514126232]


Navigation  
Top | Bottom

Contract: 514126242  Call#: 624
Project/Federal Project Number: K043-021 KA 3771-01
County: DICKINSON
Project Description: HMA OVERLAY

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 30                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126242]                           [ Non-Bid Holders List for 514126242]


Navigation  
Top | Bottom

Contract: 514126252  Call#: 625
Project/Federal Project Number: 106 KA 4080-01
County: STATEWIDE
Project Description: SURFACE RECYCLE & CHIP SEAL

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 60                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126252]                           [ Non-Bid Holders List for 514126252]


Navigation  
Top | Bottom

Contract: 514126272  Call#: 627
Project/Federal Project Number: U081-079 KA 4043-01
County: REPUBLIC
Project Description: MILL & HMA OVERLAY

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 40                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126272]                           [ Non-Bid Holders List for 514126272]


Navigation  
Top | Bottom

Contract: 514126313  Call#: 631
Project/Federal Project Number: 032 KA 4075-01
County: GOVE
Project Description: CHIP SEAL

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 15                        KDOT Construction Office: OAKLEY
Starting Dates - Earliest: JUNE 1, 2015        Latest: AUGUST 24, 2015
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126313]                           [ Non-Bid Holders List for 514126313]


Navigation  
Top | Bottom

Contract: 514126323  Call#: 632
Project/Federal Project Number: U183-074 KA 4074-01
County: PHILLIPS
Project Description: CHIP SEAL

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 15                        KDOT Construction Office: PHILLIPSBURG
Starting Dates - Earliest: JUNE 1, 2015        Latest: AUGUST 24, 2015
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126323]                           [ Non-Bid Holders List for 514126323]


Navigation  
Top | Bottom

Contract: 514126343  Call#: 634
Project/Federal Project Number: I070-091 KA 4078-01
County: SHERMAN
Project Description: SPECIAL

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 20                        KDOT Construction Office: ATWOOD
Starting Dates - Earliest: ***        Latest: MAY 4, 2015
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126343]                           [ Non-Bid Holders List for 514126343]


Navigation  
Top | Bottom

Contract: 514126353  Call#: 635
Project/Federal Project Number: I070-091 KA 4079-01
County: SHERMAN
Project Description: SPECIAL

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 30                        KDOT Construction Office: ATWOOD
Starting Dates - Earliest: ***        Latest: APRIL 20, 2015
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126353]                           [ Non-Bid Holders List for 514126353]


Navigation  
Top | Bottom

Contract: 514126414  Call#: 641
Project/Federal Project Number: K146-019 KA 3845-01
County: CRAWFORD
Project Description: MILL & HMA OVERLAY

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 20                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126414]                           [ Non-Bid Holders List for 514126414]


Navigation  
Top | Bottom

Contract: 514126424  Call#: 642
Project/Federal Project Number: U166-050 KA 3843-01
County: LABETTE
Project Description: ULTRATHIN BONDED ASPHALT SURFACING

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 35                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126424]                           [ Non-Bid Holders List for 514126424]


Navigation  
Top | Bottom

Contract: 514126434  Call#: 643
Project/Federal Project Number: K047-067 KA 3838-01
County: NEOSHO
Project Description: MILL & HMA OVERLAY

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 15                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126434]                           [ Non-Bid Holders List for 514126434]


Navigation  
Top | Bottom

Contract: 514126515  Call#: 651
Project/Federal Project Number: K254-008 KA 3826-01
County: BUTLER
Project Description: SURFACE RECYCLE & HMA OVERLAY

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 85                        KDOT Construction Office: EL DORADO
Starting Dates - Earliest: MAY 1, 2015        Latest: JUNE 1, 2015
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126515]                           [ Non-Bid Holders List for 514126515]


Navigation  
Top | Bottom

Contract: 514126525  Call#: 652
Project/Federal Project Number: U077-018 KA 4101-01
County: COWLEY
Project Description: MILL & HMA OVERLAY

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 60                        KDOT Construction Office: WINFIELD
Starting Dates - Earliest: ***        Latest: JULY 20, 2015
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126525]                           [ Non-Bid Holders List for 514126525]


Navigation  
Top | Bottom

Contract: 514126535  Call#: 653
Project/Federal Project Number: 106 KA 4096-01
County: STATEWIDE
Project Description: MILL & HMA OVERLAY

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 45                        KDOT Construction Office: WINFIELD
Starting Dates - Earliest: ***        Latest: AUGUST 10, 2015
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126535]                           [ Non-Bid Holders List for 514126535]


Navigation  
Top | Bottom

Contract: 514126545  Call#: 654
Project/Federal Project Number: U050-024 KA 3859-01
County: EDWARDS
Project Description: BRIDGE REPAIR & POLYMER OVERLAY

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 10                        KDOT Construction Office: PRATT
Starting Dates - Earliest: ***        Latest: MAY 18, 2015
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126545]                           [ Non-Bid Holders List for 514126545]


Navigation  
Top | Bottom

Contract: 514126565  Call#: 656
Project/Federal Project Number: K015-040 KA 3797-01
County: HARVEY
Project Description: MILL & HMA OVERLAY

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 30                        KDOT Construction Office: EL DORADO
Starting Dates - Earliest: ***        Latest: AUGUST 31, 2015
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126565]                           [ Non-Bid Holders List for 514126565]


Navigation  
Top | Bottom

Contract: 514126575  Call#: 657
Project/Federal Project Number: K096-106 KA 4090-01
County: STATEWIDE
Project Description: ULTRATHIN BONDED ASPHALT SURFACING

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 45                        KDOT Construction Office: WICHITA WEST
Starting Dates - Earliest: ***        Latest: JULY 13, 2015
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126575]                           [ Non-Bid Holders List for 514126575]


Navigation  
Top | Bottom

Contract: 514126585  Call#: 658
Project/Federal Project Number: K096-087 KA 3817-01
County: SEDGWICK
Project Description: MILL & HMA OVERLAY (SHOULDERS)

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 35                        KDOT Construction Office: WICHITA WEST
Starting Dates - Earliest: MARCH 16, 2015        Latest: APRIL 20, 2015
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126585]                           [ Non-Bid Holders List for 514126585]


Navigation  
Top | Bottom

Contract: 514126595  Call#: 659
Project/Federal Project Number: 096 KA 4063-01
County: SUMNER
Project Description: SURFACE RECYCLE & ASPHALT SURFACING

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports




Working Days: 95                        KDOT Construction Office: WINFIELD
Starting Dates - Earliest: ***        Latest: MAY 4, 2015
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514126595]                           [ Non-Bid Holders List for 514126595]


Navigation  
Top | Bottom

Contract: 514127535  Call#: 753
Project/Federal Project Number: I035-106 T 0006-01
County: STATEWIDE
Project Description: ULTRATHIN BONDED ASPHALT SURFACING

Expedite (EBS) Data on the Bid Express Website (non-KDOT site) PDF Document
Non-Bidding EBS FilePDF Document
Special Provision List/Additional Contract InformationPDF Document
Standard Specifications
Special Provisions
Exploratory and Project Reports
Plan SheetsPDF Document  



Working Days: CCD                        KDOT Construction Office:
Starting Dates - Earliest:        Latest:
Questions
and Answers

(prime contractor)

(subcontractor/supplier)

[ Bid Holders List for 514127535]                           [ Non-Bid Holders List for 514127535]


Navigation  
Top | Bottom

Total Records: 40



Bid Holder or Non-Bid Holder List Request Form
* Denotes a required field.


Special Characters are not allowed in input.  Please refrain from using: # $ % ^ & * : " ; ' < > ( ) / \ { } [ ]


      *
              *
                    *
                  *
                      *
   *
(Please use this format: XXXxxxxxxx)
  *
(Needed for confirmation of request)
             
(For prime contractors only. Use your five digit ID and include the leading zeros)
 

 

Questions or Comments may be sent to:
Lee Alvarado LAlvarado@ksdot.org, (785) 296-3576.

Back to Top


;
Legend
** THIS PROJECT IS GOVERNED BY SPECIAL PROVISION 07-01012(SEASONAL LIMITATIONS (OVERLAYS)).
*** As Soon as We Have a Valid Contract.
@ CONSTRUCTION OPERATIONS WHICH DELAY TRAFFIC WILL NOT BE ALLOWED DURING ACTUAL WHEAT HARVEST AS DETERMINED BY THE ENGINEER. NORMALLY, HARVEST OCCURS BETWEEN JUNE 15TH AND JULY 9TH.