Kansas Department of Transportation "...to provide a statewide transportation system to meet the needs of Kansas."
    
 

KDOT SUMMARY OF QUANTITIES

                      KANSAS DEPARTMENT OF TRANSPORTATION          PAGE:   1                                                                                                                                                                                                                           
                           SUMMARY OF QUANTITIES               DATE: 10/15/14                                                                                                                                                                                                                               
                                                               TIME:  3:32 PM                                                                                                                                                                                                                               
LETTING DATE:   October 22, 2014                                                                                                                                                                                                                                                                            
                                                                                                                                                                                                                                                                                                            
            ************************************************************                                                                                                                                                                                                                                    
            *      PRIME CONTRACTORS SHALL NOTIFY KDOT OF THEIR        *                                                                                                                                                                                                                                    
            * INTENT TO BID BY IDENTIFYING THEMSELVES AS A BID HOLDER  *                                                                                                                                                                                                                                    
            ************************************************************                                                                                                                                                                                                                                    
                                                                                                                                                                                                                                                                                                            
QUANTITY    UNIT   ITEM DESCRIPTION                                                                                                                                                                                                                                                                         
----------------------------------------------------------------------------------------                                                                                                                                                                                                                    
                                                                                                                                                                                                                                                                                                            
                                                                                                                                                                                                                                                                                                            
            PROPOSAL NO: 514102141  STATE PROJECT NO: 046 N 0581-01                                                                                                                                                                                                                                         
            WORKING DAYS: CCD  COMPLETION DATE: NOVEMBER 25 2015 DBE GOAL: $400,000                                                                                                                                                                                                                         
            COUNTY: JOHNSON                                                                                                                                                                                                                                                                                 
            GRADE & SURFACING                                                                                                                                                                                                                                                                               
            PRAIRRIE VILLAGE:  75TH STR FROM MISSION TO STATE LINE                                                                                                                                                                                                                                          
                                                                                                                                                                                                                                                                                                            
      1.00  LSUM   CONTRACTOR CONSTRUCTION STAKING                                                                                                                                                                                                                                                          
      1.00  EACH   FIELD OFFICE AND LABORATORY (TYPE A)                                                                                                                                                                                                                                                     
      1.00  CUYD   FOUNDATION STABILIZATION (SET PRICE)                                                                                                                                                                                                                                                     
      1.00  LSUM   MOBILIZATION                                                                                                                                                                                                                                                                             
      1.00  LSUM   MOBILIZATION (DBE)                                                                                                                                                                                                                                                                       
      1.00  LSUM   REMOVAL OF EXISTING STRUCTURES                                                                                                                                                                                                                                                           
      1.00  HOUR   FLAGGER (SET PRICE)                                                                                                                                                                                                                                                                      
      1.00  LSUM   CLEARING AND GRUBBING                                                                                                                                                                                                                                                                    
   1783.00  CUYD   COMMON EXCAVATION (URB)                                                                                                                                                                                                                                                                  
    229.00  CUYD   COMMON EXCAVATION (CONTRACTOR FURNISHED)                                                                                                                                                                                                                                                 
   1539.00  CUYD   ROCK EXCAVATION                                                                                                                                                                                                                                                                          
   2012.00  CUYD   COMPACTION OF EARTHWORK (TYPE   B) (MR-90)                                                                                                                                                                                                                                               
      1.00  MGAL   WATER (GRADING) (SET PRICE)                                                                                                                                                                                                                                                              
     86.10  CUYD   CONCRETE (GRADE 3.0) (AE)                                                                                                                                                                                                                                                                
      8.00  EACH   ADJUSTMENT OF MANHOLES                                                                                                                                                                                                                                                                   
     25.00  EACH   INLET (CURB) (SETBACK) (SPECIAL)                                                                                                                                                                                                                                                         
      3.00  EACH   JUNCTION BOX                                                                                                                                                                                                                                                                             
     57.00  LNFT   STORM SEWER (12") (RCP)                                                                                                                                                                                                                                                                  
    350.00  LNFT   STORM SEWER (15") (RCP)                                                                                                                                                                                                                                                                  
    124.00  LNFT   STORM SEWER (18") (RCP)                                                                                                                                                                                                                                                                  
     54.00  LNFT   STORM SEWER (21") (RCP)                                                                                                                                                                                                                                                                  
    943.00  LNFT   STORM SEWER (24") (RCP)                                                                                                                                                                                                                                                                  
    142.00  LNFT   STORM SEWER (30") (RCP)                                                                                                                                                                                                                                                                  
    105.00  LNFT   STORM SEWER (36") (RCP)                                                                                                                                                                                                                                                                  
   5794.00  SQYD   SIDEWALK CONSTRUCTION ( 4") (AE)                                                                                                                                                                                                                                                         
    456.00  SQYD   SIDEWALK RAMP                                                                                                                                                                                                                                                                            
    747.90  CUYD   CONCRETE (GRADE 4.0) (AE)                                                                                                                                                                                                                                                                
  79840.00  LBS.   REINFORCING STEEL (GRADE 60)                                                                                                                                                                                                                                                             
   1590.00  LNFT   HANDRAIL (STEEL)                                                                                                                                                                                                                                                                         
      1.00  CUYD   TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE)                                                                                                                                                                                                                                     
    407.30  CUYD   FLOWABLE FILL (LOW STRENGTH)                                                                                                                                                                                                                                                             
      1.00  LSUM   REMOVAL AND RECONSTRUCTION OF EXISTING STRUCTURES                                                                                                                                                                                                                                        
      1.00  LNFT   TEMPORARY BERM (SET PRICE)                                                                                                                                                                                                                                                               
   3279.00  LNFT   BIODEGRADABLE LOG (20")                                                                                                                                                                                                                                                                  
    261.00  LNFT   FILTER SOCK ( 8")                                                                                                                                                                                                                                                                        

KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 2 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 LSUM SWPPP DESIGN 35.00 EACH SWPPP INSPECTION 60.00 EACH WATER POLLUTION CONTROL MANAGER 1.00 MGAL WATER (EROSION CONTROL) (SET PRICE) 12479.00 LNFT CURB AND GUTTER, COMBINED (AE) (SPECIAL) 246.00 LNFT CURB, PROTECTION ( SPECIAL) (AE) 1116.00 LNFT CURB, PROTECTION ( AE) (DOWELED) 1011.00 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE) (PLAIN) 2755.00 SQYD CONCRETE PAVEMENT ( 8" UNIFORM) (AE) (PLAIN) 6894.00 TON PLANT MIX ASPHALT MIXTURE - OVERLAND PARK (SURFACE) 528.00 TON PLANT MIX ASPHALT MIXTURE - OVERLAND PARK (BASE) 1073.00 SQYD AGGREGATE BASE (AB-3) ( 6") 1.00 MGAL WATER (AGGREGATE BASE) (SET PRICE) 34224.00 SQYD MILLING 2035.00 SQYD PCCP PATCHING (FULL DEPTH) ( 9") (UNSOUND) 161.00 LNFT FENCE (CHAIN LINK) ( 4'-0") 3.00 EACH POSTS (CORNER) (CHAIN LINK) 2.00 EACH POSTS (END) (CHAIN LINK) 148.00 LNFT FENCE (WOOD PRIVACY) (6') 573.75 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 575.00 LNFT SIGN POST (2" PERFORATED SQUARE STEEL TUBE) 169.00 LNFT SIGN POST (2-1/2" PERFORATED SQUARE STEEL TUBE) 59.00 EACH SIGN POST FOOTING ( 2" PERFORATED SQUARE STEEL TUBE) 13.00 EACH SIGN POST FOOTING ( 2-1/2" PERFORATED SQUARE STEEL TUBE) 3538.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 10344.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 43.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) (12") 739.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (12") 177.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 11.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) 1.00 LSUM ELECTRIC LIGHTING SYSTEM 5653.00 SQYD SOD (TALL TURF TYPE FESCUE) (STRIPS) 234.00 LBS. FERTILIZER (12-12-12) 1.00 LSUM FURNISHING AND PLANTING PLANT MATERIALS 1.00 TON MULCHING (PERMANENT) (SET PRICE) 4.00 EACH BENCH 2.00 EACH WASTE RECEPTACLE 1.00 LSUM ROADSIDE IMPROVEMENT 28600.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 10920.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 3380.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 124800.00 EADA CHANNELIZER (PORTABLE) 4940.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 520.00 EADA ARROW DISPLAY 455.40 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 62.90 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE II TAPE OR PAINT) 146.90 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (8')(TYPE I TAPE OR PAINT)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 3 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 5435.00 LNFT PAVEMENT MARKING REMOVAL 4.00 EACH WORK ZONE SIGN (SPECIAL) (16.25 SQ.FT. & LESS) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 2.00 EACH TWORKS SIGN ASSEMBLY (BLP) PROPOSAL NO: 514102151 STATE PROJECT NO: 046 U 0163-01 WORKING DAYS: 100 COMPLETION DATE: DBE GOAL: $24,000 COUNTY: JOHNSON GRADE, BRIDGE & SURFACING DE SOTO: 95TH STR OVER CEDAR CRK 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE) 1.00 CUYD FOUNDATION STABILIZATION (SET PRICE) 1.00 LSUM CURING ENVIRONMENT 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM CLEARING AND GRUBBING 3159.00 CUYD COMMON EXCAVATION (RURAL SMALL) 50.00 CUYD COMMON EXCAVATION (UNSUITABLE) 140.00 CUYD ROCK EXCAVATION 1.00 MGAL WATER (GRADING) (SET PRICE) 686.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5) 1312.00 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) 100.00 LNFT GUARDRAIL, STEEL PLATE 54.00 LNFT ENTRANCE PIPE ( 18") 2.00 EACH END SECTION ( 18") 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 2.00 EACH TWORKS SIGN ASSEMBLY (BLP) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 4.00 EACH GUARDRAIL END TERMINAL (SRT) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 4.00 EACH GUARDRAIL END TERMINAL (FLEAT) -------------------------------------------------------------------------------- 243.00 LBS. TEMPORARY FERTILIZER (15-30-15) 32.40 LBS. TEMPORARY SEED (CANADA WILDRYE) 72.90 LBS. TEMPORARY SEED (GRAIN OATS) 72.90 LBS. TEMPORARY SEED (STERILE WHEATGRASS) 14.30 LBS. SOIL EROSION MIX
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 4 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 LNFT TEMPORARY BERM (SET PRICE) 750.00 LNFT SILT FENCE 290.00 LNFT BIODEGRADABLE LOG ( 9") 490.00 LNFT BIODEGRADABLE LOG (12") 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 LSUM SWPPP DESIGN 20.00 EACH SWPPP INSPECTION 35.00 EACH WATER POLLUTION CONTROL MANAGER 782.00 SQYD EROSION CONTROL (CLASS 1) (TYPE C) 565.00 SQYD EROSION CONTROL (CLASS 2) (TYPE F) 1458.00 LBS. MULCHING (TACKING SLURRY) 3.20 TON MULCHING (TEMPORARY) 1.00 MGAL WATER (EROSION CONTROL) (SET PRICE) 88.00 CUYD CLASS I EXCAVATION 134.00 CUYD CLASS II EXCAVATION 481.30 CUYD CONCRETE (GRADE 4.0) (AE) (SW) 66.20 CUYD CONCRETE (GRADE 4.0) (AE) 122380.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 2660.00 LBS. REINFORCING STEEL (GRADE 60) 274.00 LNFT PILES (STEEL) (HP10X42) 472.00 LNFT PILES (STEEL) (HP12X53) 2.00 EACH CONTRACTOR FURNISHED PDA 36.00 SQYD BRIDGE BACKWALL PROTECTION SYSTEM 32.00 SQYD ABUTMENT STRIP DRAIN 891.00 CUYD SLOPE PROTECTION (SHOT ROCK) 493.00 SQYD BRIDGE DECK GROOVING 84.00 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE) 721.00 TON HMA-COMMERCIAL GRADE (CLASS A) 4.00 EACH SIGNING OBJECT MARKER (TYPE 3) 72.00 LBS. FERTILIZER (13-13-13) 101.00 LBS. FERTILIZER (15-30-15) 2.50 LBS. SEED (BIG BLUESTEM GRASS) (KAW) 0.20 LBS. SEED (BLUE GRAMA GRASS) (LOVINGTON) 1.60 LBS. SEED (BUFFALO GRASS) (TREATED) 12.60 LBS. SEED (CANADA WILD-RYE) 2.50 LBS. SEED (INDIANGRASS) (OSAGE) 2.50 LBS. SEED (LITTLE BLUESTEM GRASS) (ALDOUS) 16.20 LBS. SEED (RYEGRASS) (PERENNIAL) 0.90 LBS. SEED (PRAIRIE JUNE GRASS) 10.20 LBS. SEED (SIDE OATS GRAMA) (EL RENO) 12.60 LBS. SEED (STERILE WHEATGRASS) 0.90 LBS. SEED (SWITCHGRASS) (BLACKWELL) 0.60 LBS. SEED (TALL DROP) 16.20 LBS. SEED (FESCUE) (TALL) (ENDOPHYTE-FREE) 7.20 LBS. SEED (WESTERN WHEATGRASS) (BARTON) 9.25 LBS. SEED (NATIVE WILDFLOWER MIX 1) 1.00 TON MULCHING (PERMANENT) (SET PRICE)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 5 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 514102161 STATE PROJECT NO: 089 TE 0380-01 WORKING DAYS: 85 COMPLETION DATE: DBE GOAL: $60,000 COUNTY: SHAWNEE SPECIAL MAIN STR FORM N R/W L OF THE UP RR (ANDERSOND STR.) N THRU P OTTAWATOMIE/MAIN STR. INTERS 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 CUYD FOUNDATION STABILIZATION (SET PRICE) 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 HOUR FLAGGER (SET PRICE) 249.00 CUYD COMMON EXCAVATION (RURAL SMALL) 85.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) 223.00 CUYD ROCK EXCAVATION 68.00 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) 1.00 MGAL WATER (GRADING) (SET PRICE) 71.00 CUYD SELECT SOIL (CONTRACTOR FURNISHED) 1.00 EACH ADJUSTMENT OF VALVE BOX (WATER) 203.00 LNFT SLOPE DRAIN (SPECIAL) 8.00 LNFT STORM SEWER (12") 20.00 LNFT STORM SEWER (15") 1483.00 SQYD SIDEWALK CONSTRUCTION ( 4") (AE) 66.00 SQYD SIDEWALK RAMP 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 1.00 TON TEMPORARY SURFACING MATERIAL (HMA) (SET PRICE) 5.00 EACH BENCH 4.00 EACH WASTE RECEPTACLE 2.00 EACH BICYCLE RACK 1.00 LSUM TEMPORARY SEEDING 1.00 LNFT TEMPORARY BERM (SET PRICE) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1895.00 LNFT CURB AND GUTTER, COMBINED (AE) 300.00 SQYD PAVING BRICK 121.00 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE) 114.00 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE) (PLAIN) 312.00 SQYD CONCRETE PAVEMENT ( 4" UNIFORM) (AE) (PLAIN) 505.00 SQYD AGGREGATE BASE (AB-3) ( 6") 1.00 MGAL WATER (AGGREGATE BASE) (SET PRICE) 79.13 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 136.00 LNFT SIGN POST (1-3/4" PERFORATED SQUARE STEEL TUBE) 13.00 EACH SIGN POST FOOTING ( 1-3/4" PERFORATED SQUARE STEEL TUBE) 1.00 LSUM SIGN (REMOVE AND RESET) 1.00 LSUM FLASHING BEACON SYSTEM
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 6 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 LSUM ELECTRIC LIGHTING SYSTEM 1.00 LSUM SEEDING 6.00 EACH PLANTER UNIT 1.00 LSUM WATER SYSTEM 4940.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 3900.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 19500.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 9750.00 EADA CHANNELIZER (PORTABLE) 2600.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 16.40 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 2.00 EACH TWORKS SIGN ASSEMBLY (BLP) PROPOSAL NO: 514102171 STATE PROJECT NO: 105 TE 0395-01 WORKING DAYS: 140 COMPLETION DATE: DBE GOAL: $180,000 COUNTY: WYANDOTTE PEDESTRIAN BRIDGE & BICYCLE PATHS CITY OF KANSAS CITY 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE C) 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 CUYD FOUNDATION STABILIZATION (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM CURING ENVIRONMENT 1.00 LSUM CLEARING AND GRUBBING 168.00 CUYD COMMON EXCAVATION (URB) 602.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) 110.00 CUYD COMMON EXCAVATION (UNSUITABLE) 6111.00 SQYD SALVAGED TOPSOIL 165.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5) 1.00 MGAL WATER (GRADING) (SET PRICE) 1.00 EACH INLET (TYPE 22 CURB) 1.00 EACH INLET (TYPE 22 CURB) (RADIUS) 3.00 EACH ADJUSTMENT OF MANHOLES 10.00 LNFT STORM SEWER (15") (RCP) 1.00 EACH BICYCLE RACK 170.00 SQYD SIDEWALK CONSTRUCTION ( 4") (AE) 678.00 SQYD SIDEWALK CONSTRUCTION ( 6") (AE) 54.00 SQYD SIDEWALK CONSTRUCTION ( 8") (AE) 87.00 SQYD SIDEWALK RAMP 4.00 EACH TWORKS SIGN ASSEMBLY (BLP) 180.00 LBS. TEMPORARY FERTILIZER (15-30-15) 22.00 LBS. TEMPORARY SEED (CANADA WILDRYE) 50.00 LBS. TEMPORARY SEED (GRAIN OATS)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 7 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 50.00 LBS. TEMPORARY SEED (STERILE WHEATGRASS) 9.00 LBS. SOIL EROSION MIX 5.00 EACH TEMPORARY INLET SEDIMENT BARRIER 460.00 LNFT BIODEGRADABLE LOG (12") 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 LSUM SWPPP DESIGN 25.00 EACH SWPPP INSPECTION 45.00 EACH WATER POLLUTION CONTROL MANAGER 37.00 SQYD EROSION CONTROL (CLASS 2) (TYPE E) 990.00 LBS. MULCHING (TACKING SLURRY) 2.20 TON MULCHING (TEMPORARY) 1.00 MGAL WATER (EROSION CONTROL) (SET PRICE) 563.00 CUYD CLASS III EXCAVATION 245.00 CUYD CONCRETE (GRADE 4.0) (AE) 59.00 CUYD CONCRETE (GRADE 4.0) (AE) (SA) 115.00 CUYD CONCRETE (GRADE 5.0) (AE) (PB) 51200.00 LBS. REINFORCING STEEL (GRADE 60) 28010.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 5460.00 LNFT AUGERED CAST-IN-PLACE PILE (18'') 541.00 LNFT BRIDGE HANDRAIL (METAL) (4'-0") 362.00 SQYD MULTI-LAYER POLYMER CONCRETE OVERLAY 38.00 EACH ELASTOMERIC BEARING PAD 1.00 LSUM TEMPORARY SHORING 7.40 CUYD CONCRETE (GRADE 4.0) (AE) (SA) 2200.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 6.00 SQYD AREA PREPARED FOR PATCHING (FULL DEPTH) 129.00 SQYD MACHINE PREPARATION (1.50") 24.00 SQYD MACHINE PREPARATION (2.00") 129.00 SQYD PORTLAND CEMENT CONCRETE OVERLAY (1.50") 1.00 CUYD MATERIAL FOR PORTLAND CEMENT CONCRETE OVERLAY (SET PRICE) 776.00 EACH DRILLING AND GROUTING 730.00 LNFT CONCRETE SAFETY BARRIER (SPECIAL) 747.00 LNFT BRIDGE HANDRAIL (METAL) (1'-6) 1028.00 LNFT EXPANSION JOINT (MEMBRANE SEALANT POLY-TITE) 16.00 LNFT EXPANSION DEVICE (SLIDING PLATE) 1.00 LSUM BRIDGE DRAINAGE SYSTEM 43.00 LNFT CURB AND GUTTER, COMBINED (AE) 217.00 LNFT CURB AND GUTTER, COMBINED (2'-0") (AE) (SPECIAL) 205.00 LNFT CURB, PROTECTION ( 8.0") (AE) 47.00 LNFT CONCRETE SAFETY BARRIER (TYPE II) 100.00 LNFT CONCRETE SAFETY BARRIER (SPECIAL) 25.00 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE) (BR APP) 667.00 SQYD AGGREGATE BASE (AB-3) ( 4") 1.00 MGAL WATER (AGGREGATE BASE) (SET PRICE) 261.00 LNFT FENCE (CHAIN LINK) ( 8'-0") 1.00 EACH GATE (CHAIN LINK FENCE) (16') 610.00 LNFT FENCE (CHAIN LINK) ( 6'-0") (SPECIAL) 74.00 LNFT HANDRAIL (METAL) (3'- 0")
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 8 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 186.00 LNFT FENCE (CHAIN LINK) (10'-0") (SPECIAL) 40.00 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 70.00 LNFT SIGN POST (2" PERFORATED SQUARE STEEL TUBE) 9.00 EACH SIGN POST FOOTING ( 2" PERFORATED SQUARE STEEL TUBE) 1.00 LSUM SIGN (REMOVE AND RESET) 842.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 807.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 8") 244.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (12") 274.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (12") 98.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 1870.00 LNFT PAVEMENT MARKING REMOVAL 1.00 LSUM ELECTRIC LIGHTING SYSTEM 1.00 EACH HIGH MAST LIGHT TOWER (120') (42" CONCRETE BASE) 240.00 LBS. FERTILIZER (13-13-13) 0.60 LBS. SEED (BLUE GRAMA GRASS) (LOVINGTON) 5.40 LBS. SEED (BUFFALO GRASS) (TREATED) 54.00 LBS. SEED (RYEGRASS) (PERENNIAL) 3.10 LBS. SEED (PRAIRIE JUNE GRASS) 7.60 LBS. SEED (SIDE OATS GRAMA) (EL RENO) 54.00 LBS. SEED (FESCUE) (TALL) (ENDOPHYTE-FREE) 7.20 LBS. SEED (WESTERN WHEATGRASS) (BARTON) 1.00 TON MULCHING (PERMANENT) (SET PRICE) PROPOSAL NO: 514102252 STATE PROJECT NO: 059 TE 0378-01 WORKING DAYS: 70 COMPLETION DATE: DBE GOAL: $21,000 COUNTY: MCPHERSON LIGHTING 100 N, 100 S MAIN STR, 100 W LINCOLN STR, 100 AND 200 E LINC OLN STR IN LINDSBORG 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 4819.00 SQYD SIDEWALK CONSTRUCTION ( 4") (AE) 75.00 SQYD SIDEWALK RAMP 80.00 CUYD ROCK EXCAVATION 498.00 CUYD COMMON EXCAVATION (URB) 1.00 LSUM CLEARING AND GRUBBING 4.00 EACH TWORKS SIGN ASSEMBLY (BLP) 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 4.00 EACH TEMPORARY INLET SEDIMENT BARRIER 52.00 LNFT FILTER SOCK ( 8") 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 LSUM SWPPP DESIGN 15.00 EACH SWPPP INSPECTION
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 9 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 25.00 EACH WATER POLLUTION CONTROL MANAGER 296.00 LNFT CURB AND GUTTER, COMBINED (AE) 155.00 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE) 43.00 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 168.00 LNFT SIGN POST (2" PERFORATED SQUARE STEEL TUBE) 12.00 EACH SIGN POST FOOTING ( 2" PERFORATED SQUARE STEEL TUBE) 1.00 LSUM ELECTRIC LIGHTING SYSTEM 1.00 LSUM ELECTRIC LIGHTING SYSTEM 1.00 LSUM FURNISHING AND PLANTING PLANT MATERIALS 46.00 EACH GRATE 1.00 LSUM WATER SYSTEM PROPOSAL NO: 514102262 STATE PROJECT NO: U036-079 KA 2085-01 WORKING DAYS: CCD COMPLETION DATE: DECEMBER 18 2015 DBE GOAL: $91,000 COUNTY: REPUBLIC GRADE, BRIDGE & SURFACING, STATE TIE: 36-79 KA-2334-01 BR #012; LOCATED .22 MI E OF US-81 (RILEY CREEK) 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 CUYD FOUNDATION STABILIZATION (SET PRICE) 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE) 1.00 LSUM CURING ENVIRONMENT 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM CLEANING EXISTING STRUCTURE 1.00 LSUM CLEARING AND GRUBBING 5783.00 CUYD COMMON EXCAVATION (RURAL SMALL) 4847.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) 4095.00 CUYD ROCK EXCAVATION 2163.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5) 7580.00 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) 1.00 MGAL WATER (GRADING) (SET PRICE) 19712.00 SQYD SALVAGED TOPSOIL 42.70 CUYD CONCRETE (GRADE 4.0) (RCB) 4670.00 LBS. REINFORCING STEEL (GRADE 60) 18.00 CUYD FOUNDATION STABILIZATION 28.00 CUYD GRANULAR BACKFILL (WINGWALLS) 550.00 LNFT GUARDRAIL, STEEL PLATE (MGS) 100.00 LNFT GUARDRAIL, REMOVAL AND RECONSTRUCTION OF STEEL PLATE 94.00 SQYD CONCRETE DITCH LINING 13.00 EACH RIGHT-OF-WAY SURVEY MONUMENT
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 10 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 4.00 EACH GUARDRAIL END TERMINAL (MGS-SKT) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 4.00 EACH GUARDRAIL END TERMINAL (MGS-ET-PLUS) -------------------------------------------------------------------------------- ALTERNATE SECTION: BB1 2.00 EACH GUARDRAIL END TERMINAL (MGS-FLEAT) -------------------------------------------------------------------------------- ALTERNATE SECTION: BB2 2.00 EACH GUARDRAIL END TERMINAL (MGS-SRT) -------------------------------------------------------------------------------- 675.00 LBS. TEMPORARY FERTILIZER (16-20- 0) 90.00 LBS. TEMPORARY SEED (CANADA WILDRYE) 202.50 LBS. TEMPORARY SEED (GRAIN OATS) 202.50 LBS. TEMPORARY SEED (STERILE WHEATGRASS) 22.00 LBS. SOIL EROSION MIX 1.00 LNFT TEMPORARY BERM (SET PRICE) 210.00 LNFT SILT FENCE 1281.00 LNFT BIODEGRADABLE LOG ( 9") 1281.00 LNFT BIODEGRADABLE LOG (12") 210.00 LNFT BIODEGRADABLE LOG (20") 469.00 CUYD TEMPORARY DITCH CHECK (ROCK) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 271.00 SQYD EROSION CONTROL (CLASS 1) (TYPE C) 738.00 SQYD EROSION CONTROL (CLASS 2) (TYPE E) 63.00 SQYD EROSION CONTROL (CLASS 2) (TYPE G) 4050.00 LBS. MULCHING (TACKING SLURRY) 9.00 TON MULCHING (TEMPORARY) 1.00 MGAL WATER (EROSION CONTROL) (SET PRICE) 359.00 CUYD CLASS I EXCAVATION 80.00 CUYD CLASS II EXCAVATION 711.60 CUYD CONCRETE (GRADE 4.0) (AE) (SW) 212.80 CUYD CONCRETE (GRADE 4.0) (AE) 202260.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 10060.00 LBS. REINFORCING STEEL (GRADE 60) 3299.00 LNFT PILES (STEEL) (HP12X74) 28.00 EACH CAST STEEL PILE POINTS 67.00 LNFT PRE-DRILLED PILE HOLES 142.00 LNFT TEST PILES (SPECIAL) (HP12X74) 1128.00 SQYD MULTI-LAYER POLYMER CONCRETE OVERLAY
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 11 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 LSUM TEMPORARY SHORING 86.00 SQYD BRIDGE BACKWALL PROTECTION SYSTEM 54.00 CUYD ABUTMENT AGGREGATE DRAIN 96.00 CUYD SLOPE PROTECTION (SHOT ROCK) 209.00 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE) (BR APP) 3849.00 SQYD MILLING 7839.00 SQYD AGGREGATE BASE (AB-3) ( 6") 1.00 MGAL WATER (AGGREGATE BASE) (SET PRICE) 651.00 TON MILLING 5907.00 TON HMA-COMMERCIAL GRADE (CLASS A) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 440.00 TON PAVEMENT EDGE WEDGE (ROCK) 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 651.00 TON TRANSPORTING SALVAGEABLE MATERIAL (2.5-5MI) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 748.00 LNFT FENCE (WOVEN WIRE) (TYPE B) 4.00 EACH POSTS (CORNER) (WOVEN WIRE TYPE B) 5.00 EACH POSTS (END) (WOVEN WIRE TYPE B) 64.00 LNFT SIGN POST (4" X 6" WOOD) (FLAT SHEET SIGN) 4.00 EACH SIGNING OBJECT MARKER (TYPE 3) 1.00 LSUM SIGN (REMOVE AND RESET) 240.00 LBS. FERTILIZER (13-13-13) 264.00 LBS. TEMPORARY FERTILIZER (16-20- 0) 6.60 LBS. SEED (BIG BLUESTEM GRASS) (KAW) 0.60 LBS. SEED (BLUE GRAMA GRASS) (LOVINGTON) 5.40 LBS. SEED (BUFFALO GRASS) (TREATED) 33.00 LBS. SEED (CANADA WILD-RYE) 6.60 LBS. SEED (INDIANGRASS) (OSAGE) 6.60 LBS. SEED (LITTLE BLUESTEM GRASS) (ALDOUS) 54.00 LBS. SEED (RYEGRASS) (PERENNIAL) 3.10 LBS. SEED (PRAIRIE JUNE GRASS) 28.40 LBS. SEED (SIDE OATS GRAMA) (EL RENO) 33.00 LBS. SEED (STERILE WHEATGRASS) 3.30 LBS. SEED (SWITCHGRASS) (BLACKWELL) 1.70 LBS. SEED (TALL DROP) 54.00 LBS. SEED (FESCUE) (TALL) (ENDOPHYTE-FREE) 20.40 LBS. SEED (WESTERN WHEATGRASS) (BARTON) 25.20 LBS. SEED (NATIVE WILDFLOWER MIX 2) 1.00 TON MULCHING (PERMANENT) (SET PRICE)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 12 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 514102272 STATE PROJECT NO: U036-079 KA 2334-01 WORKING DAYS: CCD COMPLETION DATE: DECEMBER 18 2015 DBE GOAL: $170,000 COUNTY: REPUBLIC GRADE & SURFACING, STATE TIE: 36-79 KA-2085-01 FROM 0.24 MI E OF US-36/US-81 JCT, E TO 1.1 MI E OF US-36/US -81 JCT 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 CUYD FOUNDATION STABILIZATION (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE) 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM CLEANING EXISTING STRUCTURE 1.00 LSUM CLEARING AND GRUBBING 15880.00 CUYD COMMON EXCAVATION (RURAL SMALL) 11932.00 CUYD ROCK EXCAVATION 1.00 MGAL WATER (GRADING) (SET PRICE) 5686.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-0-5) 4866.00 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) 295240.00 SQYD SALVAGED TOPSOIL 17.70 CUYD CONCRETE (GRADE 4.0) (RCB) 2030.00 LBS. REINFORCING STEEL (GRADE 60) 9.00 CUYD FOUNDATION STABILIZATION 24.00 CUYD GRANULAR BACKFILL (WINGWALLS) 8.00 LNFT CROSS ROAD PIPE ( 24") 124.00 LNFT CROSS ROAD PIPE ( 36") 232.00 LNFT CROSS ROAD PIPE ( 42") 2.00 EACH END SECTION ( 15") 2.00 EACH END SECTION ( 18") 10.00 EACH END SECTION ( 24") 2.00 EACH END SECTION ( 36") 4.00 EACH END SECTION ( 42") 46.00 LNFT ENTRANCE PIPE ( 18") 18.00 LNFT ENTRANCE PIPE ( 24") (RCP) 200.00 LNFT ENTRANCE PIPE ( 24") 10.00 EACH INLET (TYPE 22 CURB) 1.00 EACH INLET (TYPE 22 CURB) (RADIUS) 2.00 EACH INLET (TYPE I DITCH) 1.00 EACH MANHOLE (REINFORCED CONCRETE) 347.00 TON AGGREGATE DITCH LINING ( 6") 53.00 LNFT SLOPE DRAIN (CONCRETE)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 13 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 8.00 EACH FLUME INLET (CONCRETE) 72.00 LNFT STORM SEWER (15") (RCP) 612.00 LNFT STORM SEWER (15") 30.00 LNFT STORM SEWER (18") (RCP) 46.00 LNFT STORM SEWER (18") 584.00 LNFT STORM SEWER (24") (RCP) 16.00 LNFT STORM SEWER (24") 10.00 LNFT STORM SEWER (30") 56.10 CUYD FLOWABLE FILL (LOW STRENGTH) 11.00 EACH RIGHT-OF-WAY SURVEY MONUMENT 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 1200.00 LBS. TEMPORARY FERTILIZER (16-20- 0) 160.00 LBS. TEMPORARY SEED (CANADA WILDRYE) 360.00 LBS. TEMPORARY SEED (GRAIN OATS) 360.00 LBS. TEMPORARY SEED (STERILE WHEATGRASS) 90.00 LBS. SOIL EROSION MIX 1.00 LNFT TEMPORARY BERM (SET PRICE) 2.00 EACH TEMPORARY INLET SEDIMENT BARRIER 680.00 LNFT SILT FENCE 1818.00 LNFT BIODEGRADABLE LOG ( 9") 1818.00 LNFT BIODEGRADABLE LOG (12") 680.00 LNFT BIODEGRADABLE LOG (20") 135.00 LNFT FILTER SOCK ( 8") 114.00 CUYD TEMPORARY DITCH CHECK (ROCK) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 LSUM SWPPP DESIGN 40.00 EACH SWPPP INSPECTION 70.00 EACH WATER POLLUTION CONTROL MANAGER 272.00 SQYD EROSION CONTROL (CLASS 1) (TYPE C) 2254.00 SQYD EROSION CONTROL (CLASS 2) (TYPE E) 7200.00 LBS. MULCHING (TACKING SLURRY) 16.00 TON MULCHING (TEMPORARY) 1.00 MGAL WATER (EROSION CONTROL) (SET PRICE) 5527.00 LNFT CURB AND GUTTER, COMBINED (AE) 25140.00 SQYD CONCRETE PAVEMENT ( 8" UNIFORM) (AE) (NRDJ) 280.00 SQYD CONCRETE PAVEMENT ( 8" UNIFORM) (AE) (PLAIN) 507.00 SQYD CONCRETE PAVEMENT ( 7" UNIFORM) (AE) (PLAIN) 2887.00 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE) (PLAIN) 22472.00 SQYD AGGREGATE BASE (AB-3) ( 6") 1.00 MGAL WATER (AGGREGATE BASE) (SET PRICE) 22472.00 SQYD GRANULAR BASE ( 4") 1.00 MGAL WATER (GRANULAR BASE) (SET PRICE) 1643.00 TON SURFACING MATERIAL (SA-1) 458.00 TON PAVEMENT EDGE WEDGE (ROCK) 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 416.00 SQYD CONCRETE PAVEMENT ( 8" UNIFORM) (AE) 3822.00 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE) 33052.00 SQYD QUALITY CONTROL TESTING (PCCP)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 14 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 EACH CONCRETE CORE (SET PRICE) 1.00 LSUM CONCRETE PAVEMENT SMOOTHNESS 1.00 LSUM CONCRETE PAVEMENT COMPOSITE PAY ADJUSTMENT 2075.00 SQYD AGGREGATE BASE (AB-3) ( 6") 1.00 MGAL WATER (AGGREGATE BASE) (SET PRICE) 1392.00 TON MILLING 2514.00 TON HMA-COMMERCIAL GRADE (CLASS A) 1392.00 TON TRANSPORTING SALVAGEABLE MATERIAL (2.5-5MI) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 5.00 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 656.00 LNFT SIGN POST (4" X 6" WOOD) (FLAT SHEET SIGN) 36.00 LNFT SIGN POST (4" X 6" WOOD) (REINFORCED PANEL SIGN) 12.00 LNFT SIGN POST (2 LB/FT "U" STEEL) 1.00 LSUM SIGN (REMOVE AND RESET) 12444.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 931.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 8") 88.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (12") 16487.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 1331.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6") 252.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) (12") 90.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 36.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) 800.00 LBS. FERTILIZER (16-20- 0) 20.00 LBS. SEED (BLUE GRAMA GRASS) (LOVINGTON) 320.00 LBS. SEED (BUFFALO GRASS) (TREATED) 1.00 TON MULCHING (PERMANENT) (SET PRICE) 63180.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 7020.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 52650.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 27300.00 EADA CHANNELIZER (FIXED) 128700.00 EADA CHANNELIZER (PORTABLE) 70200.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 862.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 33695.00 LNFT PAVEMENT MARKING REMOVAL 388.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY) 350.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY - RELOCATE) 2.00 EACH INERTIAL BARRIER SYSTEM 14.00 EACH REPLACEMENT MODULES 6.00 EACH WORK ZONE SIGN (SPECIAL) (16.25 SQ.FT. & LESS) 3.00 EACH WORK ZONE SIGN (SPECIAL) (16.26 SQ.FT. & OVER) 141.00 EACH TEMPORARY RAISED PAVEMENT MARKER (TYPE II) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 2.00 EACH TWORKS SIGN ASSEMBLY (SMALL)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 15 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 514102363 STATE PROJECT NO: 026 TE 0386-01 WORKING DAYS: 55 COMPLETION DATE: DBE GOAL: $18,000 COUNTY: ELLIS PEDESTRIAN & BICYCLE PATHS CITY OF HAYS 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 41.00 CUYD COMMON EXCAVATION (URB) 30.00 CUYD ROCK EXCAVATION 42.00 SQYD AGGREGATE BASE (AB-3) ( 6") 1.00 MGAL WATER (AGGREGATE BASE) (SET PRICE) 335.00 SQYD SIDEWALK CONSTRUCTION ( 4") (AE) 121.00 SQYD SIDEWALK RAMP 141.00 LNFT CURB AND GUTTER, COMBINED (AE) 1.00 EACH BOLLARD (PERMANENT) 1.00 LSUM TEMPORARY SEEDING 5.00 EACH TEMPORARY INLET SEDIMENT BARRIER 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 254.00 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 443.00 LNFT SIGN POST (2" PERFORATED SQUARE STEEL TUBE) 49.00 EACH SIGN POST FOOTING ( 2" PERFORATED SQUARE STEEL TUBE) 22992.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 4") 108.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (12") 106.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (24") 4898.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 377.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (SHARROW) 74.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (BICYCLE) 74.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (THRU ARROW) 3095.00 LNFT PAVEMENT MARKING REMOVAL 1.00 LSUM SEEDING 11.00 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 18.00 LNFT SIGN POST (2" PERFORATED SQUARE STEEL TUBE) 2.00 EACH SIGN POST FOOTING ( 2" PERFORATED SQUARE STEEL TUBE) 11909.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 4") 13.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (BICYCLE) 13.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (THRU ARROW) 26.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (SHARROW) 25.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (SHARROW) 14.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (SHARROW) 13.00 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 19.00 LNFT SIGN POST (2" PERFORATED SQUARE STEEL TUBE) 2.00 EACH SIGN POST FOOTING ( 2" PERFORATED SQUARE STEEL TUBE) 51.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (SHARROW)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 16 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 15.00 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 27.00 LNFT SIGN POST (2" PERFORATED SQUARE STEEL TUBE) 3.00 EACH SIGN POST FOOTING ( 2" PERFORATED SQUARE STEEL TUBE) 2427.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 4") 21.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (SHARROW) 8.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (BICYCLE) 8.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (THRU ARROW) 11.00 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 18.00 LNFT SIGN POST (2" PERFORATED SQUARE STEEL TUBE) 2.00 EACH SIGN POST FOOTING ( 2" PERFORATED SQUARE STEEL TUBE) 8151.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 4") 1.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (SHARROW) 10.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (BICYCLE) 10.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (THRU ARROW) PROPOSAL NO: 514102373 STATE PROJECT NO: 026 TE 0387-01 WORKING DAYS: 50 COMPLETION DATE: DBE GOAL: $8,000 COUNTY: ELLIS PEDESTRIAN & BICYCLE PATHS CITY OF HAYS 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM CLEARING AND GRUBBING 88.00 CUYD UNCLASSIFIED EXCAVATION 438.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) 421.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-0-5) 1.00 MGAL WATER (GRADING) (SET PRICE) 11.00 SQYD SIDEWALK RAMP 2.00 EACH BOLLARD (PERMANENT) 495.00 LBS. TEMPORARY FERTILIZER (16-20- 0) 66.00 LBS. TEMPORARY SEED (CANADA WILDRYE) 150.00 LBS. TEMPORARY SEED (GRAIN OATS) 150.00 LBS. TEMPORARY SEED (STERILE WHEATGRASS) 1.00 LNFT TEMPORARY BERM (SET PRICE) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 LSUM SWPPP DESIGN 5.00 EACH SWPPP INSPECTION 10.00 EACH WATER POLLUTION CONTROL MANAGER 2095.00 LNFT BIODEGRADABLE LOG (20") 2095.00 LNFT SILT FENCE 2970.00 LBS. MULCHING (TACKING SLURRY) 6.60 TON MULCHING (TEMPORARY) 1.00 MGAL WATER (EROSION CONTROL) (SET PRICE)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 17 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 4508.00 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE) 49.00 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 75.00 LNFT SIGN POST (2" PERFORATED SQUARE STEEL TUBE) 8.00 EACH SIGN POST FOOTING ( 2" PERFORATED SQUARE STEEL TUBE) 332.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 49.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (12") 330.00 LBS. FERTILIZER (16-20- 0) 8.30 LBS. SEED (BLUE GRAMA GRASS) (LOVINGTON) 132.00 LBS. SEED (BUFFALO GRASS) (TREATED) 1.00 TON MULCHING (PERMANENT) (SET PRICE) 7.00 EACH TWORKS SIGN ASSEMBLY (BLP) 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 LSUM TRAFFIC CONTROL 1.00 LSUM CLEARING AND GRUBBING 27.00 CUYD UNCLASSIFIED EXCAVATION 61.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) 70.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-0-5) 91.00 SQYD SIDEWALK RAMP 15.00 LBS. TEMPORARY FERTILIZER (16-20- 0) 2.00 LBS. TEMPORARY SEED (CANADA WILDRYE) 4.50 LBS. TEMPORARY SEED (GRAIN OATS) 4.50 LBS. TEMPORARY SEED (STERILE WHEATGRASS) 292.00 LNFT SILT FENCE 292.00 LNFT BIODEGRADABLE LOG (20") 90.00 LBS. MULCHING (TACKING SLURRY) 0.20 TON MULCHING (TEMPORARY) 1.00 LSUM SWPPP DESIGN 3.00 EACH SWPPP INSPECTION 6.00 EACH WATER POLLUTION CONTROL MANAGER 108.00 LNFT CURB AND GUTTER, COMBINED (AE) 406.00 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE) 37.00 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 48.00 LNFT SIGN POST (2" PERFORATED SQUARE STEEL TUBE) 4.00 EACH SIGN POST FOOTING ( 2" PERFORATED SQUARE STEEL TUBE) 1.00 LSUM SIGN (REMOVE AND RESET) 106.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (12") 10.00 LBS. FERTILIZER (16-20- 0) 0.30 LBS. SEED (BLUE GRAMA GRASS) (LOVINGTON) 4.00 LBS. SEED (BUFFALO GRASS) (TREATED) 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 LSUM TRAFFIC CONTROL 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 LSUM CLEARING AND GRUBBING 40.00 CUYD UNCLASSIFIED EXCAVATION 646.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) 549.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-0-5) 2.00 EACH BOLLARD (PERMANENT) 45.00 LBS. TEMPORARY FERTILIZER (16-20- 0)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 18 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 6.00 LBS. TEMPORARY SEED (CANADA WILDRYE) 13.50 LBS. TEMPORARY SEED (GRAIN OATS) 13.50 LBS. TEMPORARY SEED (STERILE WHEATGRASS) 138.00 LNFT SILT FENCE 138.00 LNFT BIODEGRADABLE LOG (20") 270.00 LBS. MULCHING (TACKING SLURRY) 0.60 TON MULCHING (TEMPORARY) 1.00 LSUM SWPPP DESIGN 2.00 EACH SWPPP INSPECTION 4.00 EACH WATER POLLUTION CONTROL MANAGER 1790.00 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE) 4.00 EACH CONCRETE PARKING BLOCK 15.00 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 42.00 LNFT SIGN POST (2" PERFORATED SQUARE STEEL TUBE) 6.00 EACH SIGN POST FOOTING ( 2" PERFORATED SQUARE STEEL TUBE) 552.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 1.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (HANDICAP) 30.00 LBS. FERTILIZER (16-20- 0) 0.80 LBS. SEED (BLUE GRAMA GRASS) (LOVINGTON) 12.00 LBS. SEED (BUFFALO GRASS) (TREATED) PROPOSAL NO: 514102424 STATE PROJECT NO: 006 U 0070-01 WORKING DAYS: 115 COMPLETION DATE: DBE GOAL: $17,000 COUNTY: BOURBON GRADING & SURFACING FORT SCOTT PARK LOOP ROAD AND PARKING 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 CUYD FOUNDATION STABILIZATION (SET PRICE) 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM CLEARING AND GRUBBING 1.00 MGAL WATER (GRADING) (SET PRICE) 7352.00 CUYD COMMON EXCAVATION (RURAL SMALL) 671.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-3-3) 44.00 SQYD RIPRAP (LIGHT STONE) (18") 122.00 LNFT STORM SEWER ( 8") (PEP) 177.00 LNFT STORM SEWER (12") (PEP) 192.00 LNFT STORM SEWER (15") (PEP) 2.00 EACH END SECTION ( 12") (CS) 2.00 EACH END SECTION ( 15") (CS) 3.00 EACH INLET (MANHOLE) (SPECIAL) 3.00 EACH BIORETENTION CELL 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 19 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 2.00 EACH TWORKS SIGN ASSEMBLY (BLP) 592.00 LBS. TEMPORARY FERTILIZER (15-30-15) 22.00 LBS. TEMPORARY FERTILIZER (13-13-13) 78.00 LBS. TEMPORARY SEED (CANADA WILDRYE) 178.00 LBS. TEMPORARY SEED (GRAIN OATS) 178.00 LBS. TEMPORARY SEED (STERILE WHEATGRASS) 12.00 LBS. SOIL EROSION MIX 1.00 LNFT TEMPORARY BERM (SET PRICE) 120.00 LNFT SILT FENCE 3705.00 LNFT BIODEGRADABLE LOG ( 9") 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 LSUM SWPPP DESIGN 25.00 EACH SWPPP INSPECTION 40.00 EACH WATER POLLUTION CONTROL MANAGER 550.00 SQYD EROSION CONTROL (CLASS 1) (TYPE C) 3546.00 LBS. MULCHING (TACKING SLURRY) 8.00 TON MULCHING (TEMPORARY) 1.00 MGAL WATER (EROSION CONTROL) (SET PRICE) 173.00 SQYD CONCRETE PAVEMENT ( 9" UNIFORM) (AE) (PLAIN) 151.00 LNFT CURB AND GUTTER, COMBINED (AE) 2537.00 TON HMA-COMMERCIAL GRADE (CLASS A) 1718.00 SQYD AGGREGATE BASE (AB-3) (12") 1.00 MGAL WATER (AGGREGATE BASE) (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 32.25 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 63.00 LNFT SIGN POST (4" X 6" WOOD) (FLAT SHEET SIGN) 574.00 LNFT PAVEMENT MARKING (THERMOPLASTIC) (WHITE) ( 4") 42.00 LNFT PAVEMENT MARKING (THERMOPLASTIC) (WHITE) (12") 410.00 LNFT PAVEMENT MARKING (THERMOPLASTIC) (YELLOW) ( 6") 4.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (BICYCLE) 27.80 LBS. SEED (MIX 1) 0.80 LBS. SEED (MIX 2) 297.70 LBS. SEED (MIX 3) 500.00 LBS. FERTILIZER (8-8-8) 1.00 LSUM FURNISHING AND PLANTING PLANT MATERIALS 1.00 TON MULCHING (PERMANENT) (SET PRICE) 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 17.00 LNFT SLOPE DRAIN (STONE) 329.00 LNFT CURB AND GUTTER, COMBINED (AE) 2236.00 TON HMA-COMMERCIAL GRADE (CLASS A) 1034.00 SQYD AGGREGATE BASE (AB-3) (12") 16.75 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 38.00 LNFT SIGN POST (4" X 6" WOOD) (FLAT SHEET SIGN) 801.00 LNFT PAVEMENT MARKING (THERMOPLASTIC) (WHITE) ( 4") 49.00 LNFT PAVEMENT MARKING (THERMOPLASTIC) (WHITE) (12") 2.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (THRU ARROW) 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 LSUM MOBILIZATION
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 20 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 LSUM ELECTRIC LIGHTING SYSTEM 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 268.00 CUYD COMMON EXCAVATION (RURAL SMALL) 73.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-3-3) 14.00 SQYD SIDEWALK CONSTRUCTION ( 6") (AE) 718.00 TON HMA-COMMERCIAL GRADE (CLASS A) 90.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 365.00 CUYD COMMON EXCAVATION (RURAL SMALL) 85.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-3-3) 7.00 SQYD SIDEWALK CONSTRUCTION ( 6") (AE) 534.00 TON HMA-COMMERCIAL GRADE (CLASS A) 80.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 LSUM ELECTRIC LIGHTING SYSTEM 1.00 LSUM FURNISHING AND PLANTING PLANT MATERIALS 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 LSUM ELECTRIC LIGHTING SYSTEM 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 345.00 CUYD COMMON EXCAVATION (RURAL SMALL) 176.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-3-3) 3.00 SQYD SIDEWALK CONSTRUCTION ( 6") (AE) 463.00 TON HMA-COMMERCIAL GRADE (CLASS A) 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 50.00 CUYD COMMON EXCAVATION (RURAL SMALL) 2.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-3-3) 6.00 SQYD SIDEWALK CONSTRUCTION ( 6") (AE) 144.00 TON HMA-COMMERCIAL GRADE (CLASS A) 30.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") PROPOSAL NO: 514102595 STATE PROJECT NO: 087 TE 0598-01 WORKING DAYS: 45 COMPLETION DATE: DBE GOAL: $18,000 COUNTY: SEDGWICK PEDESTRIAN & BICYCLE PATH CITY OF VALLEY CENTER 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 LSUM MOBILIZATION 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 EACH MAILBOX INSTALLATION (SET PRICE) 1.00 LSUM CLEARING AND GRUBBING 295.00 CUYD COMMON EXCAVATION (URB) 45.00 CUYD ROCK EXCAVATION 1.00 MGAL WATER (GRADING) (SET PRICE) 2599.00 SQYD SIDEWALK CONSTRUCTION ( 4") (AE) 49.00 SQYD SIDEWALK RAMP
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 21 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 101.00 LNFT FILTER SOCK ( 8") 1.00 LSUM TEMPORARY SEEDING 1.00 LNFT TEMPORARY BERM (SET PRICE) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 MGAL WATER (EROSION CONTROL) (SET PRICE) 193.00 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE) 285.00 LNFT CURB AND GUTTER, COMBINED (AE) 108.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (12") 13.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 1.00 LSUM SEEDING PROPOSAL NO: 514104151 STATE PROJECT NO: 046 C 0051-01 WORKING DAYS: 120 COMPLETION DATE: DBE GOAL: $204,000 COUNTY: JOHNSON GRADE, BRIDGE & SURFACING MISSION RD 0.85 MI N 175THh STR. 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 LSUM CURING ENVIRONMENT 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE C) 1.00 CUYD FOUNDATION STABILIZATION (SET PRICE) 1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE) 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM CLEARING AND GRUBBING 1831.00 CUYD COMMON EXCAVATION (RURAL SMALL) 96.00 CUYD ROCK EXCAVATION 18955.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) 18330.00 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) 1.00 MGAL WATER (GRADING) (SET PRICE) 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 350.00 LNFT GUARDRAIL, STEEL PLATE (MGS) 363.00 LNFT CONCRETE SAFETY BARRIER (TYPE II-F) (SPECIAL) 1.00 EACH IMPACT ATTENUATOR (TL-2) 1.00 EACH MAILBOX INSTALLATION (SET PRICE) 131.00 LNFT STORM SEWER (12") 82.00 LNFT ENTRANCE PIPE ( 12") 6.00 EACH END SECTION ( 12") 1.00 EACH INLET (MANHOLE) (SPECIAL) 1.00 EACH INLET (SPECIAL) 7.00 CUYD SLOPE PROTECTION (RIPRAP STONE) 105.00 TON AGGREGATE DITCH LINING ( 6") 57.00 TON AGGREGATE DITCH LINING (12")
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 22 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 3.00 EACH GUARDRAIL END TERMINAL (MGS-ET-PLUS) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 3.00 EACH GUARDRAIL END TERMINAL (MGS-SKT) -------------------------------------------------------------------------------- 14058.00 SQFT RETAINING WALL (MBW) 300.00 LBS. TEMPORARY FERTILIZER (15-30-15) 40.00 LBS. TEMPORARY SEED (CANADA WILDRYE) 90.00 LBS. TEMPORARY SEED (GRAIN OATS) 90.00 LBS. TEMPORARY SEED (STERILE WHEATGRASS) 13.20 LBS. SOIL EROSION MIX 1.00 LNFT TEMPORARY BERM (SET PRICE) 2.00 EACH TEMPORARY INLET SEDIMENT BARRIER 110.00 LNFT SILT FENCE 648.00 LNFT BIODEGRADABLE LOG ( 9") 648.00 LNFT BIODEGRADABLE LOG (12") 110.00 LNFT BIODEGRADABLE LOG (20") 156.00 CUYD TEMPORARY DITCH CHECK (ROCK) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 LSUM SWPPP DESIGN 25.00 EACH SWPPP INSPECTION 45.00 EACH WATER POLLUTION CONTROL MANAGER 145.00 SQYD EROSION CONTROL (CLASS 1) (TYPE C) 134.00 SQYD EROSION CONTROL (CLASS 2) (TYPE E) 1800.00 LBS. MULCHING (TACKING SLURRY) 4.00 TON MULCHING (TEMPORARY) 1.00 MGAL WATER (EROSION CONTROL) (SET PRICE) 238.00 CUYD CONCRETE (GRADE 4.0) (AE) (SA) 29.00 CUYD CONCRETE (GRADE 4.0) (AE) 55480.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 605.00 LNFT PRESTRESSED CONCRETE BEAM (NU63) 80.00 LNFT PRE-DRILLED PILE HOLES 544.00 LNFT PILES (STEEL) (HP14X73) 88.00 SQYD BRIDGE BACKWALL PROTECTION SYSTEM 98.00 CUYD ABUTMENT AGGREGATE DRAIN 563.00 SQYD MULTI-LAYER POLYMER CONCRETE OVERLAY 24.00 CUYD SLOPE PROTECTION (AGGREGATE) 283.00 LNFT CASED PILE 417.00 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE) (BR APP) 13.00 TON FLY ASH 1.00 MGAL WATER (TREATED SUBGRADE) (SET PRICE) 301.00 SQYD MANIPULATION FOR TREATED SUBGRADE (FLY ASH)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 23 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 360.00 LNFT GUTTERS (AE) 981.00 LNFT GUTTERS (SPECIAL) (2'-0") (AE) 1793.00 TON HMA-COMMERCIAL GRADE (CLASS A) 233.00 TON FLY ASH 4138.00 SQYD MANIPULATION FOR TREATED SUBGRADE (FLY ASH) 1.00 MGAL WATER (TREATED SUBGRADE) (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 888.00 LNFT FENCE (SPECIAL) (4') 21.00 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 82.00 LNFT SIGN POST (2 LB/FT "U" STEEL) 4.00 EACH SIGNING OBJECT MARKER (TYPE 2) 2370.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 2370.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 360.00 LBS. SEED (FESCUE) (TALL TURF TYPE BLEND) 200.00 LBS. FERTILIZER (15-30-15) 1.00 TON MULCHING (PERMANENT) (SET PRICE) 2880.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 3060.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 3600.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 3960.00 EADA CHANNELIZER (PORTABLE) 3600.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 14.00 EACH WORK ZONE SIGN (SPECIAL) (16.25 SQ.FT. & LESS) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 2.00 EACH TWORKS SIGN ASSEMBLY (BLP) PROPOSAL NO: 514104171 STATE PROJECT NO: 105 TE 0604-01 WORKING DAYS: 55 COMPLETION DATE: DBE GOAL: $60,000 COUNTY: WYANDOTTE PEDESTRIAN & BICYCLE PATHS CITY OF KANSAS CITY 1.00 LSUM MOBILIZATION 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 CUYD FOUNDATION STABILIZATION (SET PRICE) 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM CLEARING AND GRUBBING 601.00 CUYD ROCK EXCAVATION 46.00 STA. LINEAR GRADING (TYPE AA) (MR-0-5) 1.00 MGAL WATER (GRADING) (SET PRICE) 5128.00 SQYD SIDEWALK CONSTRUCTION ( 6") (AE) 369.00 SQYD SIDEWALK CONSTRUCTION ( 4") (AE) 423.00 SQYD SIDEWALK RAMP 2.00 EACH INLET (CURB) 4.00 LNFT STORM SEWER (18") (RCP) 4.00 LNFT STORM SEWER (12") (PVCP) 2.00 EACH ADJUSTMENT OF MANHOLES 17.00 EACH ADJUSTMENT OF VALVE BOX (WATER)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 24 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 LNFT TEMPORARY BERM (SET PRICE) 9.00 EACH TEMPORARY INLET SEDIMENT BARRIER 1962.00 LNFT SILT FENCE 355.00 LNFT BIODEGRADABLE LOG ( 9") 182.00 LNFT FILTER SOCK ( 8") 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 LSUM SWPPP DESIGN 15.00 EACH SWPPP INSPECTION 25.00 EACH WATER POLLUTION CONTROL MANAGER 1.00 MGAL WATER (EROSION CONTROL) (SET PRICE) 2143.00 LNFT CURB AND GUTTER, COMBINED (2'-0") (AE) 1534.00 LNFT CURB, EDGE ( 6.0") (AE) 450.00 LNFT CURB, HEADER (AE) 55.00 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE) (PLAIN) 266.00 SQYD CONCRETE PAVEMENT ( 8" UNIFORM) (AE) (PLAIN) 321.00 SQYD AGGREGATE BASE (AB-3) ( 6") 1.00 MGAL WATER (AGGREGATE BASE) (SET PRICE) 8.00 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 4.00 LNFT SIGN POST (2" PERFORATED SQUARE STEEL TUBE) 4.00 EACH SIGN POST FOOTING ( 2" PERFORATED SQUARE STEEL TUBE) 1.00 LSUM SIGN (REMOVE AND RESET) 506.00 LNFT PAVEMENT MARKING (THERMOPLASTIC) (WHITE) ( 6") 90.00 LNFT PAVEMENT MARKING (THERMOPLASTIC) (WHITE) (24") 1982.00 LNFT PAVEMENT MARKING (THERMOPLASTIC) (YELLOW) ( 4") 33.00 EACH PAVEMENT MARKING (THERMOPLASTIC) (YELLOW) (8") 1.00 EACH PAVEMENT MRK SYM (THERMOPLASTIC) (WHITE) (LEFT ARROW) 1358.00 LNFT PAVEMENT MARKING REMOVAL 1.00 LSUM TRAFFIC SIGNAL 3292.00 SQYD SOD (FESCUE) (STRIPS) 3340.00 SQYD MULCHING (HYDRO) 1.00 LSUM SEEDING 2890.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 495.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 2560.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 9075.00 EADA CHANNELIZER (PORTABLE) 17.40 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 1735.00 LNFT PAVEMENT MARKING REMOVAL 270.00 LNFT FENCE (PEDESTRIAN) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 2.00 EACH TWORKS SIGN ASSEMBLY (BLP)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 25 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 514104636 STATE PROJECT NO: 060 C 4637-01 WORKING DAYS: 15 COMPLETION DATE: DBE GOAL: $0 COUNTY: MEADE SIGNING MEADE CO: MULTIPLE ROUTES THROUGHOUT THE CO. 1.00 LSUM MOBILIZATION 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 684.40 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 1792.00 LNFT SIGN POST (2" PERFORATED SQUARE STEEL TUBE) 128.00 EACH SIGN POST FOOTING ( 2" PERFORATED SQUARE STEEL TUBE) PROPOSAL NO: 514104676 STATE PROJECT NO: 060 C 4638-01 WORKING DAYS: 15 COMPLETION DATE: DBE GOAL: $0 COUNTY: MEADE SIGNING MEADE CO: VARIOUS CO RDS 1.00 LSUM MOBILIZATION 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 220.00 EACH SIGNING OBJECT MARKER (TYPE 3) PROPOSAL NO: 514106141 STATE PROJECT NO: U069-046 KA 2788-01 WORKING DAYS: 60 COMPLETION DATE: DBE GOAL: COUNTY: JOHNSON SPECIAL US-69: BR.NO.(256) 0.14 MI S OF I-35 JCT AT TURKEY CREEK ************************************************************ * NOTE: THERE IS A PRE-BID CONFERENCE ON THIS PROJECT. * * ATTENDANCE IS REQUIRED TO BE ELIGIBLE TO BID. * ************************************************************ 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 LSUM MOBILIZATION 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM CLEARING AND GRUBBING 4667.00 CUYD CLASS III EXCAVATION 849.00 CUYD SLOPE PROTECTION (RIPRAP STONE) 107.00 CUYD BEDDING FOR SLOPE PROTECTION
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 26 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 3.00 STA. LINEAR GRADING (TYPE A) (MR-5-5) 1.00 MGAL WATER (GRADING) (SET PRICE) 150.00 LNFT GUARDRAIL, STEEL PLATE 30.00 TON PAVEMENT EDGE WEDGE (ROCK) 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 1100.00 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-90) 30.00 LNFT ENTRANCE PIPE ( 12") -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 1.00 EACH GUARDRAIL END TERMINAL (MGS-SRT) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 1.00 EACH GUARDRAIL END TERMINAL (MGS-FLEAT) -------------------------------------------------------------------------------- 428.80 CUYD CONCRETE (GRADE 4.0) 60470.00 LBS. REINFORCING STEEL (GRADE 60) 397.00 CUYD ROCK EXCAVATION 1733.00 CUYD GRANULAR BACKFILL 250.00 SQYD SEPARATION GEOTEXTILE 5233.00 SQFT RETAINING WALL (SOIL NAIL) 5233.00 SQFT SHOT-CRETE FOR SOIL NAIL RETAINING WALL 4.00 EACH VERIFICATION TEST 8415.00 LNFT PERMANENT SOIL NAILS #8 BAR (GRADE 60) 1.00 LSUM TEMPORARY SHORING 1.00 LSUM TEMPORARY SEEDING 1.00 LNFT TEMPORARY BERM (SET PRICE) 1040.00 LNFT SILT FENCE 100.00 LNFT BIODEGRADABLE LOG ( 9") 100.00 LNFT BIODEGRADABLE LOG (12") 100.00 LNFT BIODEGRADABLE LOG (20") 6.00 CUYD TEMPORARY DITCH CHECK (ROCK) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 MGAL WATER (EROSION CONTROL) (SET PRICE) 148.00 LNFT FENCE (CHAIN LINK) ( 6'-0") (SPECIAL) 1.00 LSUM SEEDING
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 27 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 514106181 STATE PROJECT NO: I035-046 KA 3652-01 WORKING DAYS: 10 COMPLETION DATE: DBE GOAL: COUNTY: JOHNSON SIGNING I-35/I-635 INTCH, TRUSS (#046S223) E OF BR #258 1.00 LSUM MOBILIZATION 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 429.30 SQFT SIGN (REINFORCED PANEL) (HIGH PERFORMANCE) 1.00 EACH OVERHEAD SIGN STRUCTURE (100.1'-110.0') (ALUMINUM) PROPOSAL NO: 514106192 STATE PROJECT NO: K018-081 KA 3857-01 WORKING DAYS: 15 COMPLETION DATE: DBE GOAL: COUNTY: RILEY BRIDGE REPAIR K-18:BR.NO.(041)0.12 MI N OF GE CO L OVER THE KANSAS RIVER 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MOBILIZATION 1.00 LSUM BRIDGE REPAIR 110.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 400.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 130.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 30.00 EADA ARROW DISPLAY 1620.00 EADA CHANNELIZER (PORTABLE) 170.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 80.50 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 336.00 LNFT PAVEMENT MARKING REMOVAL PROPOSAL NO: 514106201 STATE PROJECT NO: I070-031 KA 3985-01 WORKING DAYS: 25 COMPLETION DATE: DBE GOAL: COUNTY: GEARY SPECIAL I-70:EB AND WB REST AREAS, AT STATE MILEPOST 294 NEAR JUNCTI ON CITY 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 LSUM CLEARING AND GRUBBING 1.00 MGAL WATER (GRADING) (SET PRICE) 48.90 STA. LINEAR GRADING (TYPE B) (MR-90)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 28 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 7033.00 CUYD ROCK EXCAVATION 660.00 LBS. TEMPORARY FERTILIZER (16-20- 0) 88.00 LBS. TEMPORARY SEED (CANADA WILDRYE) 198.00 LBS. TEMPORARY SEED (STERILE WHEATGRASS) 198.00 LBS. TEMPORARY SEED (GRAIN OATS) 1.00 LNFT TEMPORARY BERM (SET PRICE) 200.00 LNFT SILT FENCE 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 600.00 LNFT BIODEGRADABLE LOG ( 9") 100.00 LNFT BIODEGRADABLE LOG (20") 1.00 LSUM SWPPP DESIGN 10.00 EACH SWPPP INSPECTION 10.00 EACH WATER POLLUTION CONTROL MANAGER 1.00 MGAL WATER (EROSION CONTROL) (SET PRICE) 8.80 TON MULCHING (TEMPORARY) 1280.00 LNFT FENCE (CHAIN LINK) ( 4'-0") 740.00 LNFT FENCE (WOVEN WIRE) (TYPE B) 4.00 EACH POSTS (CORNER) (CHAIN LINK) 2.00 EACH POSTS (CORNER) (WOVEN WIRE TYPE B) 2.00 EACH POSTS (END) (CHAIN LINK) 2.00 EACH POSTS (END) (WOVEN WIRE TYPE B) 3.00 EACH POSTS (PULL) (CHAIN LINK) 1.00 EACH POSTS (PULL) (WOVEN WIRE TYPE B) 2.00 EACH GATE (WOVEN WIRE FENCE) (16') 2.00 EACH GATE (CHAIN LINK FENCE) (14') 70.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 210.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 1400.00 EADA CHANNELIZER (PORTABLE) PROPOSAL NO: 514106292 STATE PROJECT NO: 106 KA 4040-01 WORKING DAYS: 55 COMPLETION DATE: DBE GOAL: COUNTY: JEWELL REPUBLIC C106 MILL & HMA OVERLAY K-28: KA 3770 K-14 JCT E TO K-148 JCT, 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 2.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY) 1.00 EACH ASPHALT CORE (SET PRICE) 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 1073.00 TON MILLING
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 29 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 6990.00 TON HMA OVERLAY (SR-12.5A) (PG 64-22) 19.00 TON EMULSIFIED ASPHALT (SS-1HP) 6990.00 TON QUALITY CONTROL TESTING (HMA) 312.60 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 23.90 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 786.00 TON PAVEMENT EDGE WEDGE (ROCK) 7571.00 TON HMA OVERLAY (SR-12.5A) (PG 64-22) 20.00 TON EMULSIFIED ASPHALT (SS-1HP) 7571.00 TON QUALITY CONTROL TESTING (HMA) 369.60 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 998.00 TON PAVEMENT EDGE WEDGE (ROCK) 171.00 TON MILLING 17624.00 TON HMA OVERLAY (SR-12.5A) (PG 64-22) 46.00 TON EMULSIFIED ASPHALT (SS-1HP) 17624.00 TON QUALITY CONTROL TESTING (HMA) 818.40 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 3069.00 TON PAVEMENT EDGE WEDGE (ROCK) 57532.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 37941.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 520.00 LNFT PAVEMENT MARKING REMOVAL 73089.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 40428.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 161399.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 95078.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 48.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (12") 4.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE)(RAILROAD XING) 2712.00 LNFT PAVEMENT MARKING REMOVAL PROPOSAL NO: 514106303 STATE PROJECT NO: U083-020 KA 3668-01 WORKING DAYS: 15 COMPLETION DATE: DBE GOAL: COUNTY: DECATUR CHIP SEAL US-83: FROM 9 MI N OF SD CO L N TO PCCP IN OBERLIN 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE) 1707.00 CUYD COVER MATERIAL (CM-L-2) 424.10 STA. MANIPULATION (CHIP SEAL) 424.10 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 348.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 30 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 270.00 TON ASPHALT CEMENT (AC-10-2TR) -------------------------------------------------------------------------------- PROPOSAL NO: 514106313 STATE PROJECT NO: U083-055 KA 3669-01 WORKING DAYS: 40 COMPLETION DATE: DBE GOAL: COUNTY: LOGAN MILL & HMA OVERLAY STATE TIED TO 83-55 M 0041-01 FROM THE LG/SC CO LN THENCE N 29.120 TO THE E JCT OF US-83/U S-40 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 1.00 EACH ASPHALT CORE (SET PRICE) 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 519156.00 SQYD MILLING 56484.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22) 519156.00 SQYD EMULSIFIED ASPHALT 56484.00 TON QUALITY CONTROL TESTING (HMA) 1537.50 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 1537.50 STA. RUMBLE STRIPS (MILLED) (ASPHALT) (CENTERLINE) 3075.00 STA. RUMBLE STRIPS (MILLED) (ASPHALT) 306800.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 67755.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") PROPOSAL NO: 514106323 STATE PROJECT NO: U083-055 M 0041-01 WORKING DAYS: CCD COMPLETION DATE: OCTOBER 16 2015 DBE GOAL: COUNTY: LOGAN STOCKPILE ASPHALT MATERIAL STATE TIED TO 83-55 KA 3669-01 US-83 SC CO L N TO E US-40 JCT 250.00 TON HMA-COMMERCIAL GRADE (CLASS A)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 31 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 514106343 STATE PROJECT NO: 055 KA 3976-01 WORKING DAYS: 25 COMPLETION DATE: DBE GOAL: COUNTY: LOGAN CHIP SEAL K-25: KA 3664 RUSSELL SPRINGS NCL N TO W US-40 JCT, 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE) 1415.00 CUYD COVER MATERIAL (CM-L-2) 596.10 STA. MANIPULATION (CHIP SEAL) 596.10 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 288.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 224.00 TON ASPHALT CEMENT (AC-10-2TR) -------------------------------------------------------------------------------- 4160.00 CUYD COVER MATERIAL (CM-L-2) 1889.20 STA. MANIPULATION (CHIP SEAL) 1889.20 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) -------------------------------------------------------------------------------- ALTERNATE SECTION: BB1 847.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) -------------------------------------------------------------------------------- ALTERNATE SECTION: BB2 657.00 TON ASPHALT CEMENT (AC-10-2TR) --------------------------------------------------------------------------------
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 32 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 514106353 STATE PROJECT NO: K117-077 KA 3670-01 WORKING DAYS: 25 COMPLETION DATE: DBE GOAL: COUNTY: RAWLINS SURFACE RECYCLE & CHIP SEAL K-117:US-36 JCT N TO NE STATE L 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE) 632.40 STA. SURFACE RECYCLING (2") 211.00 TON ASPHALT REJUVENATING AGENT 1254.80 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 1383.00 CUYD COVER MATERIAL (CM-L-2) 632.40 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) 632.40 STA. MANIPULATION (CHIP SEAL) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 253.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 196.00 TON ASPHALT CEMENT (AC-10-2TR) -------------------------------------------------------------------------------- PROPOSAL NO: 514106363 STATE PROJECT NO: U024B-091 KA 3663-01 WORKING DAYS: 20 COMPLETION DATE: DBE GOAL: COUNTY: SHERMAN MILL & HMA OVERLAY US-24B: END OF PCCP E OF K-27 JCT E TO I-70 JCT 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 1.00 EACH ASPHALT CORE (SET PRICE) 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 58782.00 SQYD MILLING 9593.00 TON HMA OVERLAY (SR-12.5A) (PG 64-22) 25.00 TON EMULSIFIED ASPHALT (SS-1H OR CSS-1H)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 33 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 9593.00 TON QUALITY CONTROL TESTING (HMA) 170.50 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 170.50 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 21939.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 17183.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 144.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) (12") 5.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) PROPOSAL NO: 514106373 STATE PROJECT NO: K027-091 KA 3665-01 WORKING DAYS: 25 COMPLETION DATE: DBE GOAL: COUNTY: SHERMAN ULTRATHIN BONDED ASPHALT SURFACING K-27: END OF PCCP AT US-24B JCT N TO CN CO L 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 10755.00 TON HMA SURFACE (ULTRATHIN BONDED) (TYPE B) (PG 70-28) 257.00 TON EMULSIFIED ASPHALT (EMULSION BONDING LIQUID) 1597.00 TON HMA-COMMERCIAL GRADE (CLASS A) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 14680.00 SQYD MILLING 873.90 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 26.50 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 50981.00 LNFT PAVEMENT MARKING (THERMOPLASTIC) (YELLOW) ( 4") 171496.00 LNFT PAVEMENT MARKING (THERMOPLASTIC) (WHITE) ( 6") 261.00 LNFT PAVEMENT MARKING (THERMOPLASTIC) (YELLOW) (12") PROPOSAL NO: 514106383 STATE PROJECT NO: I070-091 KA 4036-01 WORKING DAYS: 75 COMPLETION DATE: DBE GOAL: COUNTY: SHERMAN MILL & HMA OVERLAY STATE TIED TO 70-91 M 0042-01 I-70: 0.25 MI W OF K-27 JCT E TO 0.98 MI E OF EXIT 27 (NEAR EDSON) 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 HOUR FLAGGER (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 132.00 CUYD ROCK EXCAVATION 57.00 CUYD COMMON EXCAVATION (RURAL SMALL) 375.00 SQYD AGGREGATE BASE (AB-3) ( 6") 1.00 MGAL WATER (AGGREGATE BASE) (SET PRICE) 240.00 EACH DRILLING AND GROUTING
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 34 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 499.00 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE) (BR APP) 37.50 CUYD BRIDGE APPROACH SLAB FOOTING 540.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 630.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 2160.00 EADA WORK ZONE SIGNS (16.26 SQ.FT. & OVER) 3600.00 EADA CHANNELIZER (PORTABLE) 810.00 EADA WORK ZONE WARNING LIGHT (RED TYPE "B" HIGH INTENSITY) 270.00 EADA ARROW DISPLAY 15.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE II TAPE OR PAINT) 180.00 LNFT PAVEMENT MARKING REMOVAL 750.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY) 750.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY - RELOCATE) 3.00 EACH INERTIAL BARRIER SYSTEM 16.00 EACH REPLACEMENT MODULES 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 15360.00 TON HMA OVERLAY (SR-12.5B) (PG 70-22) 15360.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22) 10145.00 TON HMA OVERLAY (SR-12.5B) (PG 64-22) (SHOULDER) 10145.00 TON HMA OVERLAY (SR-12.5A) (PG 64-22) (SHOULDER) 60.00 TON HMA-COMMERCIAL GRADE (CLASS A) 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 EACH ASPHALT CORE (SET PRICE) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 51010.00 TON QUALITY CONTROL TESTING (HMA) 119.00 TON EMULSIFIED ASPHALT (EMULSION BONDING LIQUID) 101.00 TON EMULSIFIED ASPHALT (SS-1H OR CSS-1H) 649.30 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (8')(TYPE I TAPE OR PAINT) 1298.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (8')(TYPE II TAPE OR PAINT 161.30 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 169.50 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE II TAPE OR PAINT) 20.50 STAL PAVEMENT MARKING (TEMP) 4" DOTTED EXTENSION (TYPE I TAPE OR 41.00 STAL PAVEMENT MARKING (TEMP) 4" DOTTED EXTENSION (TYPE II TAPE OR 5121.00 TON PAVEMENT EDGE WEDGE (ROCK) 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 161125.00 SQYD MILLING 972.00 SQYD PCCP PATCHING (FULL DEPTH) (10") (SOUND) 198.00 SQYD PCCP JOINT AND CRACK PATCHING (PARTIAL DEPTH) 48.00 SQYD PCCP JOINT AND CRACK PATCHING (FULL DEPTH) 1298.70 STA. RUMBLE STRIPS (MILLED) (ASPHALT) 87151.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 1690.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 8") 240.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (12") 85.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 69909.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6")
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 35 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 514106393 STATE PROJECT NO: I070-091 M 0042-01 WORKING DAYS: CCD COMPLETION DATE: OCTOBER 16 2015 DBE GOAL: COUNTY: SHERMAN STOCKPILE ASPHALT MATERIAL STATE TIED TO 70-91 KA 4036-01 I-70: 0.25 MI W of K-27 JCT E to K-263 JCT 200.00 TON HMA-COMMERCIAL GRADE (CLASS A) PROPOSAL NO: 514106433 STATE PROJECT NO: 097 M 0038-01 WORKING DAYS: CCD COMPLETION DATE: JULY 03 2015 DBE GOAL: COUNTY: THOMAS STOCKPILE ASPHALT MATERIAL OAKLEY MIXING STRIP APPROX MM 154 ON W SIDE OF US-83 & AT CO LBY SUB AREA SHOP ON W SIDE OF K-25 1200.00 TON AGGREGATE FOR ASPHALT MIXTURE (BM-1) 72.00 TON EMULSIFIED ASPHALT (CMS-1) PROPOSAL NO: 514106505 STATE PROJECT NO: U281-004 KA 3829-01 WORKING DAYS: 30 COMPLETION DATE: DBE GOAL: COUNTY: BARBER MICROSURFACING US-281: OK STATE L N TO US-160 JCT 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 11257.00 TON AGGREGATE FOR MICROSURFACING 1351.00 TON EMULSIFIED ASPHALT (CSS-1H) (MODIFIED) 225.00 TON MINERAL FILLER 1262.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) 1262.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 79767.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 246586.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6")
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 36 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 514106515 STATE PROJECT NO: K042-106 KA 4034-01 WORKING DAYS: 35 COMPLETION DATE: DBE GOAL: COUNTY: BARBER KINGMAN PRATT MILL & HMA OVERLAY KA 3802 PR CO L E TO KM CO L, 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 1.00 EACH ASPHALT CORE (SET PRICE) 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 2.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY) 33387.00 TON QUALITY CONTROL TESTING (HMA) 289.60 STA. MILLING 9173.00 TON HMA OVERLAY (SR- 9.5A) (PG 64-22) 28.00 TON EMULSIFIED ASPHALT (SS-1HP) 1330.00 TON PAVEMENT EDGE WEDGE (ROCK) 476.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) 276.10 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 33.40 STA. MILLING 4068.00 TON HMA OVERLAY (SR- 9.5A) (PG 64-22) 15.00 TON EMULSIFIED ASPHALT (SS-1HP) 747.00 TON PAVEMENT EDGE WEDGE (ROCK) 258.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) 33.40 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 207.00 STA. MILLING 20146.00 TON HMA OVERLAY (SR- 9.5A) (PG 64-22) 74.00 TON EMULSIFIED ASPHALT (SS-1HP) 3141.00 TON PAVEMENT EDGE WEDGE (ROCK) 1253.60 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) 206.50 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 37 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 514106525 STATE PROJECT NO: K096-005 KA 3818-01 WORKING DAYS: 30 COMPLETION DATE: DBE GOAL: COUNTY: BARTON SURFACE RECYCLE & HMA OVERLAY K-96: RH CO L E TO GREAT BEND WCL 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 2689.00 SQYD MILLING 719.70 STA. SURFACE RECYCLING (1.5") 230.00 TON ASPHALT REJUVENATING AGENT 13793.00 TON HMA OVERLAY (SR- 9.5A) (PG 70-22) 54.00 TON EMULSIFIED ASPHALT (SS-1HP) 13793.00 TON QUALITY CONTROL TESTING (HMA) 719.70 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 1439.30 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 2024.00 TON PAVEMENT EDGE WEDGE (ROCK) 661.70 STA. RUMBLE STRIPS (MILLED) (ASPHALT) (CENTERLINE) 24388.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 143956.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") PROPOSAL NO: 514106535 STATE PROJECT NO: U281-005 KA 3828-01 WORKING DAYS: 25 COMPLETION DATE: DBE GOAL: COUNTY: BARTON MILL & HMA OVERLAY US-281:W K4 JCT N TO RS CO L 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 1.00 EACH ASPHALT CORE (SET PRICE) 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 5436.00 TON MILLING 16315.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22) 199939.00 SQYD EMULSIFIED ASPHALT
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 38 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 16315.00 TON QUALITY CONTROL TESTING (HMA) 1662.00 TON PAVEMENT EDGE WEDGE (ROCK) 585.10 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 585.10 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 583.10 STA. RUMBLE STRIPS (MILLED) (ASPHALT) (CENTERLINE) 31477.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 116870.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 90.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) (12") PROPOSAL NO: 514106545 STATE PROJECT NO: K014-106 KA 4035-01 WORKING DAYS: 100 COMPLETION DATE: DBE GOAL: COUNTY: KINGMAN RENO C106 SURFACE RECYCLE & HMA OVERLAY K-14: KA 3791 E US-54 JCT N TO RN CO L, 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 HOUR FLAGGER (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 1.00 EACH ASPHALT CORE (SET PRICE) 21671.00 TON QUALITY CONTROL TESTING (HMA) 1.00 LSUM SURFACE RECYCLING PAY ADJUSTMENT 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 1.00 MGAL WATER (GRADING) (SET PRICE) 2.00 EACH TWORKS SIGN ASSEMBLY (SMALL) 1.00 LSUM SIGN (REMOVE AND RESET) 450.00 STA. SHOULDERS (EARTH) (HMA WIDENING) 1174.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) 1615.00 STA. SHOULDERS (EARTH) (HMA WIDENING) 4094.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) 179.20 LBS. TEMPORARY FERTILIZER (15-30-15) 44.80 LBS. TEMPORARY SEED (CANADA WILDRYE) 100.80 LBS. TEMPORARY SEED (GRAIN OATS) 100.80 LBS. TEMPORARY SEED (STERILE WHEATGRASS) 1.00 LNFT TEMPORARY BERM (SET PRICE) 14.00 LNFT BIODEGRADABLE LOG ( 9") 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 LSUM SWPPP DESIGN 5.00 EACH SWPPP INSPECTION 10.00 EACH WATER POLLUTION CONTROL MANAGER 4.50 TON MULCHING (TEMPORARY) 1.00 MGAL WATER (EROSION CONTROL) (SET PRICE) 1288.80 LBS. TEMPORARY FERTILIZER (15-30-15) 322.20 LBS. TEMPORARY SEED (CANADA WILDRYE) 725.00 LBS. TEMPORARY SEED (GRAIN OATS)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 39 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 725.00 LBS. TEMPORARY SEED (STERILE WHEATGRASS) 1.00 LNFT TEMPORARY BERM (SET PRICE) 62.00 LNFT BIODEGRADABLE LOG ( 9") 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 LSUM SWPPP DESIGN 20.00 EACH SWPPP INSPECTION 30.00 EACH WATER POLLUTION CONTROL MANAGER 32.20 TON MULCHING (TEMPORARY) 1.00 MGAL WATER (EROSION CONTROL) (SET PRICE) 231.00 STA. SURFACE RECYCLING (2") 78.00 TON ASPHALT REJUVENATING AGENT 1333.00 SQYD MILLING 6516.00 TON HMA OVERLAY (SR- 9.5A) (PG 64-22) 19.00 TON EMULSIFIED ASPHALT (SS-1HP) 2720.00 TON HMA-COMMERCIAL GRADE (CLASS A) 631.00 TON PAVEMENT EDGE WEDGE (ROCK) 282.90 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) 565.80 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 877.40 STA. SURFACE RECYCLING (2") 298.00 TON ASPHALT REJUVENATING AGENT 628.00 SQYD MILLING 15155.00 TON HMA OVERLAY (SR- 9.5A) (PG 64-22) 59.00 TON EMULSIFIED ASPHALT (SS-1HP) 10686.00 TON HMA-COMMERCIAL GRADE (CLASS A) 2198.00 TON PAVEMENT EDGE WEDGE (ROCK) 877.40 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) 1754.80 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 461.00 STA. RUMBLE STRIPS (MILLED) (ASPHALT) 1755.00 STA. RUMBLE STRIPS (MILLED) (ASPHALT) PROPOSAL NO: 514106565 STATE PROJECT NO: U400-049 KA 3263-01 WORKING DAYS: 35 COMPLETION DATE: DBE GOAL: COUNTY: KIOWA MILL & HMA OVERLAY US-400:FO CO L E TO US-54 JCT 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 1.00 EACH ASPHALT CORE (SET PRICE) 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 1.00 LSUM ASPHALT PAVEMENT SMOOTHNESS 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 2.00 EACH TWORKS SIGN ASSEMBLY (SMALL)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 40 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 10438.00 TON MILLING 5266.00 TON HMA OVERLAY (SR- 9.5A) (PG 70-22) 16397.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22) 4142.00 TON HMA OVERLAY (SR- 9.5A) (PG 64-22) (SHOULDER) 6112.00 TON HMA OVERLAY (SR-12.5A) (PG 64-22) (SHOULDER) 81.00 TON EMULSIFIED ASPHALT (SS-1HP) 31917.00 TON QUALITY CONTROL TESTING (HMA) 2478.00 TON PAVEMENT EDGE WEDGE (ROCK) 353.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 705.90 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 119.80 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 119.80 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE II TAPE OR PAINT) 271.80 STA. RUMBLE STRIPS (MILLED) (ASPHALT) (CENTERLINE) 543.60 STA. RUMBLE STRIPS (MILLED) (ASPHALT) 70190.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 22889.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 5435.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6") 96.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") PROPOSAL NO: 514106575 STATE PROJECT NO: K019-106 KA 4033-01 WORKING DAYS: 25 COMPLETION DATE: DBE GOAL: COUNTY: PAWNEE STAFFORD C106 MILL & HMA OVERLAY KA 3800 PN CO L E TO US-281 JCT 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 1.00 EACH ASPHALT CORE (SET PRICE) 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 8401.00 TON MILLING 12607.00 TON HMA OVERLAY (SR-12.5A) (PG 64-22) 154503.00 SQYD EMULSIFIED ASPHALT 12607.00 TON QUALITY CONTROL TESTING (HMA) 1680.00 TON PAVEMENT EDGE WEDGE (ROCK) 537.50 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) 537.50 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 7150.00 TON MILLING 10730.00 TON HMA OVERLAY (SR-12.5A) (PG 64-22) 131489.00 SQYD EMULSIFIED ASPHALT 10730.00 TON QUALITY CONTROL TESTING (HMA) 1477.00 TON PAVEMENT EDGE WEDGE (ROCK) 472.70 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 41 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 472.70 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT PROPOSAL NO: 514106585 STATE PROJECT NO: U281-076 KA 3827-01 WORKING DAYS: 15 COMPLETION DATE: DBE GOAL: COUNTY: PRATT ULTRATHIN BONDED ASPHALT SURFACING US-281: PRATT NCL N TO IUKA NCL 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 2934.00 TON HMA SURFACE (ULTRATHIN BONDED) (TYPE A) (PG 70-28) 75.00 TON EMULSIFIED ASPHALT (EMULSION BONDING LIQUID) 545.00 CUYD COVER MATERIAL (CM-L-2) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 111.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) 267.00 STA. MANIPULATION (CHIP SEAL) 288.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE) 271.90 STA. RUMBLE STRIPS (MILLED) (ASPHALT) (CENTERLINE) 29475.00 LNFT PAVEMENT MARKING (THERMOPLASTIC) (YELLOW) ( 4") 56926.00 LNFT PAVEMENT MARKING (THERMOPLASTIC) (WHITE) ( 6") PROPOSAL NO: 514106595 STATE PROJECT NO: K096-087 KA 3576-01 WORKING DAYS: 40 COMPLETION DATE: DBE GOAL: COUNTY: SEDGWICK BRIDGE REPAIR & POLYMER OVERLAY K-96: BR.NOS.(315)&(328)0.56 & 0.61 MI E OF WEST STREET OVER THE ARKANSAS RIVER 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MOBILIZATION 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 39.00 CUYD CONCRETE (GRADE 4.0) (AE) (SW) 8370.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (SET PRICE) 102.00 EACH DRILLING AND GROUTING 198.00 LNFT EXPANSION JOINT (STRIP SEAL ASSEMBLY) 5.00 EACH BEARING (STEEL) 279.00 EACH WELDED STUD SHEAR CONNECTORS 1.00 LSUM BRIDGE PAINTING (ORGANIC ZINC W/ ACRYLIC SYSTEM) 1.00 LSUM ENVIRONMENTAL PROTECTION 10.00 SQYD AREA PREPARED FOR PATCHING 5.00 SQYD AREA PREPARED FOR PATCHING (FULL DEPTH) 5864.00 SQYD MULTI-LAYER POLYMER CONCRETE OVERLAY 11.80 CUYD CONCRETE (GRADE 4.0) (AE) (SW) 2590.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 42 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (SET PRICE) 55.00 LNFT EXPANSION JOINT (STRIP SEAL ASSEMBLY) 108.00 EACH WELDED STUD SHEAR CONNECTORS 1.00 LSUM BRIDGE PAINTING (ORGANIC ZINC W/ ACRYLIC SYSTEM) 1.00 LSUM ENVIRONMENTAL PROTECTION 10.00 SQYD AREA PREPARED FOR PATCHING 5.00 SQYD AREA PREPARED FOR PATCHING (FULL DEPTH) 1376.00 SQYD MULTI-LAYER POLYMER CONCRETE OVERLAY 2445.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 2892.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6") 1242.00 LNFT PAVEMENT MARKING (PATTERNED COLD PLASTIC) (WHITE) ( 6") 1036.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 8") 2800.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 1840.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 400.00 EADA WORK ZONE SIGNS (16.26 SQ.FT. & OVER) 720.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 8800.00 EADA CHANNELIZER (PORTABLE) 1280.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 80.00 EADA ARROW DISPLAY 102.80 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 1.90 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (8')(TYPE I TAPE OR PAINT) 4286.00 LNFT PAVEMENT MARKING REMOVAL 1325.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY) 1263.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY - RELOCATE) 1.00 EACH INERTIAL BARRIER SYSTEM 15.00 EACH REPLACEMENT MODULES 1.00 EACH WORK ZONE SIGN (SPECIAL) (16.25 SQ.FT. & LESS) 2.00 EACH WORK ZONE SIGN (SPECIAL) (16.26 SQ.FT. & OVER) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 1.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY) PROPOSAL NO: 514106605 STATE PROJECT NO: U050-093 KA 3264-01 WORKING DAYS: 55 COMPLETION DATE: DBE GOAL: COUNTY: STAFFORD MILL & HMA OVERLAY STATE TIED TO 50-93 KA 3806-01 US-50:MACKSVILLE WCL E TO MACKSVILLE ECL 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 2.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY) 1.00 EACH ASPHALT CORE (SET PRICE) 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 43 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 LSUM ASPHALT PAVEMENT SMOOTHNESS 6537.00 TON MILLING 1585.00 TON HMA SURFACE (SR- 9.5A) (PG 70-28) 4424.00 TON HMA BASE (SR-12.5A) (PG 70-28) 3301.00 TON HMA BASE (SR-19A) (PG 64-22) 19.00 TON EMULSIFIED ASPHALT (SS-1HP) 9310.00 TON QUALITY CONTROL TESTING (HMA) 54.60 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 109.20 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 9562.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 11838.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 215.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) (12") 24.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) PROPOSAL NO: 514106615 STATE PROJECT NO: U050-093 KA 3806-01 WORKING DAYS: 55 COMPLETION DATE: DBE GOAL: COUNTY: STAFFORD MILL & HMA OVERLAY STATE TIE TO 50-93 KA 3264-01 US-50:ED CO L W TO US-281 JCT 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 2.00 EACH TWORKS SIGN ASSEMBLY (SMALL) 1.00 EACH ASPHALT CORE (SET PRICE) 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 2315.00 TON PAVEMENT EDGE WEDGE (ROCK) 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 6150.00 TON MILLING 16978.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22) 12655.00 TON HMA OVERLAY (SR-12.5A) (PG 64-22) (SHOULDER) 362420.00 SQYD EMULSIFIED ASPHALT 29633.00 TON QUALITY CONTROL TESTING (HMA) 741.70 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 741.70 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 741.70 STA. RUMBLE STRIPS (MILLED) (ASPHALT) (CENTERLINE) 1483.30 STA. RUMBLE STRIPS (MILLED) (ASPHALT) 146916.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 22507.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4")
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 44 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 514106625 STATE PROJECT NO: U281-093 KA 3830-01 WORKING DAYS: 25 COMPLETION DATE: DBE GOAL: COUNTY: STAFFORD HMA OVERLAY US-281:US-50 JCT N TO K-19 JCT 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 1.00 EACH ASPHALT CORE (SET PRICE) 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 3144.00 SQYD MILLING 21711.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22) 57.00 TON EMULSIFIED ASPHALT (SS-1HP) 21711.00 TON QUALITY CONTROL TESTING (HMA) 2777.00 TON PAVEMENT EDGE WEDGE (ROCK) 740.50 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 681.60 STA. RUMBLE STRIPS (MILLED) (ASPHALT) (CENTERLINE) 37341.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 148196.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 12.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 1.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (STOP) 1.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (AHEAD) PROPOSAL NO: 514106636 STATE PROJECT NO: 106 KA 4029-01 WORKING DAYS: 95 COMPLETION DATE: DBE GOAL: COUNTY: C106 GRANT STEVENS MILL & HMA OVERLAY K-25: KA 3697 SV CO L N TO ULYSSES SCL, 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 1.00 EACH ASPHALT CORE (SET PRICE) 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 2.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY) 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 45 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 10252.00 TON MILLING 17941.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22) 7686.00 TON HMA OVERLAY (SR-12.5A) (PG 64-22) 225760.00 SQYD EMULSIFIED ASPHALT 25627.00 TON QUALITY CONTROL TESTING (HMA) 1413.50 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 5300.00 TON AGGREGATE FOR SHOULDERS (AS-1) 1413.50 STA. SHOULDERS (EARTH) (HMA WIDENING) 4913.00 TON MILLING 4894.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22) 19.00 TON HMA-COMMERCIAL GRADE (CLASS A) (PATCHING) 54452.00 SQYD EMULSIFIED ASPHALT 4894.00 TON QUALITY CONTROL TESTING (HMA) 275.70 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 10042.00 TON MILLING 17574.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22) 7529.00 TON HMA OVERLAY (SR-12.5A) (PG 64-22) 221139.00 SQYD EMULSIFIED ASPHALT 25103.00 TON QUALITY CONTROL TESTING (HMA) 1384.50 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 5192.00 TON AGGREGATE FOR SHOULDERS (AS-1) 1384.40 STA. SHOULDERS (EARTH) (HMA WIDENING) 24.20 STA. RUMBLE STRIPS (MILLED) (ASPHALT) 139841.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 29119.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 4758.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 21418.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 100.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (12") 266.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 136432.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 31286.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 2.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE)(RAILROAD XING) 22.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") PROPOSAL NO: 514106646 STATE PROJECT NO: U050-038 KA 3680-01 WORKING DAYS: 60 COMPLETION DATE: DBE GOAL: COUNTY: HAMILTON MILL & HMA OVERLAY US-50: CO STATE L E TO SYRACUSE ECL 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 2.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 1.00 EACH ASPHALT CORE (SET PRICE)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 46 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE) 29073.00 TON MILLING 29073.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22) 274223.00 SQYD EMULSIFIED ASPHALT 29073.00 TON QUALITY CONTROL TESTING (HMA) 1054.70 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 301.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) 1478.00 CUYD COVER MATERIAL (CM-L-1) 907.20 STA. MANIPULATION (CHIP SEAL) 809.70 STA. RUMBLE STRIPS (MILLED) (ASPHALT) (CENTERLINE) 1619.40 STA. RUMBLE STRIPS (MILLED) (ASPHALT) 172303.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 48721.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") PROPOSAL NO: 514106656 STATE PROJECT NO: U083-106 KA 4032-01 WORKING DAYS: 95 COMPLETION DATE: DBE GOAL: COUNTY: HASKELL SEWARD C106 SURFACE RECYCLE & HMA OVERLAY US-83: KA 3681 SW CO L N TO 1000 FT N OF N US-160 JCT, 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 EACH ASPHALT CORE (SET PRICE) 2.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY) 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 2824.00 TON MILLING 513.40 STA. SURFACE RECYCLING (2") 171.00 TON ASPHALT REJUVENATING AGENT 18485.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22) 11792.00 TON HMA OVERLAY (SR-12.5A) (PG 64-22) (SHOULDER) 61.00 TON EMULSIFIED ASPHALT (SS-1HP) 30277.00 TON QUALITY CONTROL TESTING (HMA) 629.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 1026.70 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 70.00 EADA PILOT CAR WAIT TIME SYSTEM 4717.00 TON PAVEMENT EDGE WEDGE (ROCK) 25.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) 146.00 CUYD COVER MATERIAL (CM-L-1) 115.60 STA. MANIPULATION (CHIP SEAL) 1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 47 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 244.00 SQYD MILLING 429.70 STA. SURFACE RECYCLING (2") 148.00 TON ASPHALT REJUVENATING AGENT 14107.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22) 10145.00 TON HMA OVERLAY (SR-12.5A) (PG 64-22) (SHOULDER) 48.00 TON EMULSIFIED ASPHALT (SS-1HP) 24252.00 TON QUALITY CONTROL TESTING (HMA) 429.70 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 859.40 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 55.00 EADA PILOT CAR WAIT TIME SYSTEM 3223.00 TON PAVEMENT EDGE WEDGE (ROCK) 629.00 STA. RUMBLE STRIPS (MILLED) (ASPHALT) (CENTERLINE) 1026.70 STA. RUMBLE STRIPS (MILLED) (ASPHALT) 429.70 STA. RUMBLE STRIPS (MILLED) (ASPHALT) (CENTERLINE) 859.40 STA. RUMBLE STRIPS (MILLED) (ASPHALT) 125577.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 19050.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 1.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE)(RAILROAD XING) 24.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 85964.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 14132.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") PROPOSAL NO: 514106686 STATE PROJECT NO: 106 KA 3968-01 WORKING DAYS: 85 COMPLETION DATE: DBE GOAL: COUNTY: C106 LANE SCOTT SURFACE RECYCLE & HMA OVERLAY KA 3696-01: US-83 JCT E TO SC CO L, 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 EACH ASPHALT CORE (SET PRICE) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 2.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY) 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 629.70 STA. SURFACE RECYCLING (1.5") 202.00 TON ASPHALT REJUVENATING AGENT 1259.40 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 17254.00 TON HMA OVERLAY (SR-12.5A) (PG 64-22) 45.00 TON EMULSIFIED ASPHALT (SS-1HP) 629.70 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 17254.00 TON QUALITY CONTROL TESTING (HMA) 4722.00 TON AGGREGATE FOR SHOULDERS (AS-1) 604.20 STA. SURFACE RECYCLING (1.5")
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 48 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 193.00 TON ASPHALT REJUVENATING AGENT 1208.50 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 17788.00 TON HMA OVERLAY (SR-12.5A) (PG 64-22) 46.00 TON EMULSIFIED ASPHALT (SS-1HP) 633.60 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 17788.00 TON QUALITY CONTROL TESTING (HMA) 4532.00 TON AGGREGATE FOR SHOULDERS (AS-1) 1065.00 TON MILLING 602.20 STA. SURFACE RECYCLING (2") 251.00 TON ASPHALT REJUVENATING AGENT 1204.50 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT 286.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) 1653.00 CUYD COVER MATERIAL (CM-L-2) 1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE) 602.20 STA. MANIPULATION (CHIP SEAL) 602.20 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) 125938.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 20169.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 127200.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 29275.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") PROPOSAL NO: 514106706 STATE PROJECT NO: K025-034 KA 3685-01 WORKING DAYS: 35 COMPLETION DATE: DBE GOAL: COUNTY: GRANT MILL & HMA OVERLAY K-25:ULYSSES NCL N TO KE CO L 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 1.00 EACH ASPHALT CORE (SET PRICE) 2.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY) 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 7717.00 TON MILLING 13462.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22) 5658.00 TON HMA OVERLAY (SR-12.5A) (PG 64-22) 169313.00 SQYD EMULSIFIED ASPHALT 19120.00 TON QUALITY CONTROL TESTING (HMA) 1040.60 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 3902.00 TON AGGREGATE FOR SHOULDERS (AS-1) 1040.60 STA. SHOULDERS (EARTH) (HMA WIDENING) 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 103890.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 22025.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4")
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 49 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 514106716 STATE PROJECT NO: K190-106 KA 4028-01 WORKING DAYS: 25 COMPLETION DATE: DBE GOAL: COUNTY: C106 GRANT HASKELL HMA OVERLAY KA-3692-01: GT CO L E TO W US-56 JCT 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 1.00 EACH ASPHALT CORE (SET PRICE) 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 312.00 SQYD MILLING 7206.00 TON HMA OVERLAY (SR-12.5A) (PG 64-22) 19.00 TON EMULSIFIED ASPHALT (SS-1HP) 7206.00 TON QUALITY CONTROL TESTING (HMA) 317.90 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) 317.90 STA. PAVEMENT EDGE WEDGE (EARTH) 312.00 SQYD MILLING 7570.00 TON HMA OVERLAY (SR-12.5A) (PG 64-22) 20.00 TON EMULSIFIED ASPHALT (SS-1HP) 7570.00 TON QUALITY CONTROL TESTING (HMA) 332.60 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) 332.60 STA. PAVEMENT EDGE WEDGE (EARTH) PROPOSAL NO: 514106726 STATE PROJECT NO: U160-106 KA 4014-01 WORKING DAYS: 45 COMPLETION DATE: DBE GOAL: COUNTY: GRANT STANTON C106 MILL & HMA OVERLAY KA 3690-01 N K-27 JCT E TO GT CO L 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE) 1.00 EACH ASPHALT CORE (SET PRICE) 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 2.00 EACH TWORKS SIGN ASSEMBLY (SMALL) 8816.00 TON MILLING
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 50 SUMMARY OF QUANTITIES DATE: 10/15/14 TIME: 3:32 PM LETTING DATE: October 22, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 12377.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22) 151684.00 SQYD EMULSIFIED ASPHALT 12377.00 TON QUALITY CONTROL TESTING (HMA) 448.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 12816.00 TON MILLING 19224.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22) 235587.00 SQYD EMULSIFIED ASPHALT 19224.00 TON QUALITY CONTROL TESTING (HMA) 686.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT) 89105.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 15849.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 136676.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 27542.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 12.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24")

Last updated : December 23, 2009